RH - Hot-Mix Asphalt, Tack and Prime - AVON PARK
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force has issued a Combined Synopsis/Solicitation for the provision and delivery of Hot-Mix Asphalt (HMA), Tack, and Prime Coats to Avon Park Air Force Range, Florida. This opportunity is a Total Small Business Set-Aside with offers due by May 5, 2026, 5:00 PM Local Time.
Scope of Work
The contractor shall provide all plant, labor, material, design, and supervision to deliver approximately 8,001 tons of hot mix asphalt (HMA) and 8,072 gallons of Bituminous Tack and Prime Coats. Deliveries are specifically for Taxiway Hotel, a Type A traffic area supporting C-17 Operations. Key requirements include:
- HMA: 8,001 tons of HMA Intermediate Course, Type B with PG 67-22 binder. Must be a minimum of 290 degrees Fahrenheit at delivery, with a minimum production of 500 tons per 8-hour workday and a maximum 30-minute interval between delivery trucks.
- Bituminous Coats: 1,960 gallons of Tack Coat and 6,200 gallons of Prime Coat, both Grade SS-1.
- Quality Control: Provide field and laboratory quality control testing, including core testing for JMF deviations.
- Compliance: All materials and application must conform to UFGS 32.12.15.13 (HMA), UFGS 32.12.13 (Tack/Prime Coats), Unified Facilities Criteria (UFC), and Avon Park Air Force Range Design Standards.
Contract & Timeline
- Contract Type: Firm Fixed Price
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 324121 (Asphalt Paving Mixture and Block Manufacturing), Size Standard: 500 employees
- Delivery Period: June 1, 2026, to September 30, 2026
- Offer Due Date: May 5, 2026, 5:00 PM Local Time
- RFI Questions Due: April 21, 2026
- Published Date: April 15, 2026
- Place of Performance: Avon Park Air Force Range, Avon Park, FL 33826
Key Requirements & Submittals
Bidders must submit a proposed Job Mix Formula (JMF) and other detailed submittals prior to work commencement, including Design & Materials Data (HMA Mix Design, binder, aggregate data) and Quality & Safety Plans. Equipment for application, particularly the Bituminous Distributor, must meet specific calibration and performance standards. Payment requests will be processed via Wide Area WorkFlow (WAWF).
Contact Information
For questions, contact SrA Jon Soucy at jon.soucy@us.af.mil.