Roof Repairs Buildings BB260, BB265, & BB270

SOL #: N4008526R9015Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Roofing Contractors (238160)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 24, 2026
2
Last Updated
Mar 11, 2026
3
Submission Deadline
Mar 27, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, specifically NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for Roof Repairs at Buildings BB260, BB265, and BB270 at Marine Corps Base Camp Lejeune, NC. This is a Total Small Business Set-Aside opportunity, restricted to specific Roofing MACC Contractors listed on the General Requirements cover page. Proposals are due by March 27, 2026, at 2:00 PM EST.

Scope of Work

The project involves comprehensive roof repairs, including:

  • Removal and disposal of existing roof systems down to the deck.
  • Replacement of up to 5% of rotted/damaged decking.
  • Installation of new aluminum drip edge, self-adhering ice and water membrane, and elastomeric expansion joints.
  • Installation of a new aluminum standing seam metal roof with a vented ridge cap, designed for a 150 MPH wind rating.
  • Installation of pipe boots and permanent fall protection.
  • Repair and refinishing of areas disturbed by new work.
  • The facility must remain watertight throughout construction, and the contractor must coordinate site access and staging with the COR.

Contract Details

  • Type: Combined Synopsis/Solicitation
  • Estimated Cost Range: Between $1,000,000 and $5,000,000.
  • Contract Completion: 360 days after award.
  • Liquidated Damages: $880 per Calendar Day.
  • Wage Determination: General Decision Number NC20260010 (01/02/2026 Building) applies.
  • Bonds: Bid bonds (20% for proposals >=$150K) and Payment bonds (for proposals >=$35K) are required.
  • Requirements: Buy American Requirement-Construction Materials provision is included.

Eligibility & Submission

  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Restriction: Only Roofing MACC Contractors listed on the General Requirements cover page may submit a proposal.
  • Proposal Due: March 27, 2026, by 2:00 PM EST.
  • RFI Cut-off: March 12, 2026, by 2:00 PM EST.
  • Site Visit: An amendment (Amendment 0001) scheduled a site visit for March 4, 2026, at 0900 am EST at Building BB260.
  • Amendments: Bidders must acknowledge receipt of all amendments (0001, 0002, 0003) with their proposal. Amendment 0003 provides a pricing sheet with Exhibit Line Items (ELINs 0001-0005) for various repair tasks; offers must be submitted on all line items.

Evaluation

Award will be based on the Lowest Price. The Government will evaluate offers by adding the prices for ELINs 0001 through 0005.

Special Requirements

  • Environmental Compliance: Contractors must adhere to the "Contractor Environmental Guide" for MCB Camp Lejeune, covering hazardous materials, waste disposal, asbestos, lead-based paint (fascia contains LBP), and stormwater management. A survey for asbestos is required.
  • Technical Specifications: Adherence to detailed specifications for Aluminum Standing Seam Roofing (e.g., 07 61 15.00 20) and various UFC, IBC, NFPA, ABA, ADA, and ICC/ANSI standards is mandatory.
  • Site Conditions: Field verification of all measurements and existing conditions is required before bidding. The contractor must hire a professional utility locator and notify the COR 48 hours prior to excavation.
  • Operational Facility: The facility will remain in operation during construction, requiring minimal interference.

Contacts

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Mar 10, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 27, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 24, 2026
View
Roof Repairs Buildings BB260, BB265, & BB270 | GovScope