RS/RV Centrifuge AT Hill AFB, UT
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force, specifically the 309th Missile Maintenance Group at Hill Air Force Base, Utah, is seeking proposals for the procurement, delivery, installation, and training for one (1) new RS/RV Centrifuge. This acquisition is set aside for Small Businesses and will be awarded on a Lowest Price Technically Acceptable (LPTA) basis. Offers are due by Wednesday, June 10, 2026, at 4 PM MST.
Scope of Work
The requirement is for a new RS/RV Centrifuge system to replace existing equipment, ensuring continued support for operational acceptance/assurance testing, troubleshooting, repair, and aging/surveillance testing of MMIII MK12A and MK21 Reentry Vehicles and their components. Key deliverables include:
- Initial Project Mobilization & Planning
- Factory Acceptance & Pre-Shipment Readiness
- System & Data Delivery to Site
- Site Acceptance Test (SAT) Completion
- Final Acceptance & Project Closeout
- On-Site Warranty Labor and Travel The Purchase Specification (PS) dated April 21, 2026, details the technical requirements, including physical, functional, design, and performance specifications. The system must operate in a TEMPEST-controlled environment, with all wireless/recording capabilities physically removed or permanently disabled.
Contract Details
- Contract Type: Combined Synopsis/Solicitation (RFQ), Firm Fixed Price (FFP) for CLINs 0001-0005.
- Set-Aside: Total Small Business Set-Aside.
- NAICS Code: 334515, with a Small Business Size Standard of 450 Employees.
- Period of Performance: An anticipated 30 months ARO for labor and installation (CLINs 0001-0005), followed by a 12-month warranty period (CLINs 0006-0007), totaling 42 months.
- Place of Performance: Hill Air Force Base, UT 84056, United States.
Deliverables & Data Requirements (CDRLs)
Contract Data Requirements Lists (CDRLs) specify various data items, including:
- Factory Acceptance Test Plan (A001) and Report (A002)
- Site Acceptance Test Plan (A003) and Report (A004)
- Safety Assessment Report (A005)
- Proposed Spare Parts List (A006)
- Certificate of Compliance (A007)
- Commercial Off-The-Shelf (COTS) Manuals (A008)
- Integrated Master Schedule (A009) These CDRLs outline specific formats, submission timelines, and government review processes. For instance, the IMS (A009) must be submitted in native Microsoft Project (.mpp) and PDF, resource-loaded, with an initial baseline due 30 days after award and monthly updates.
Submission & Evaluation
- Evaluation Basis: Lowest Price Technically Acceptable (LPTA), as per FAR 52.212-2 and its addendum.
- Offer Submission: Electronically via email to Melissa Huston (melissa.huston.2@us.af.mil) and Lanette Todd (lanette.todd@us.af.mil).
- Required Documents: Offerors must include a completed copy of FAR 52.212-3, Offeror Representations and Certifications, and provide their Cage code.
Key Dates
- Questions Due: Tuesday, May 20, 2026, 12 PM MST.
- Offers Due: Wednesday, June 10, 2026, 4 PM MST.
Contact Information
- Primary Point of Contact: Lanette Todd (lanette.todd@us.af.mil, 801-777-2807)
- Secondary Point of Contact: Melissa Huston (melissa.huston.2@us.af.mil)
Additional Notes
An ombudsman, Ms. Kayla Marshall (kayla.marshall@us.af.mil, 801-777-6549), is available for concerns not resolved by the contracting officer, but does not handle solicitation copies, due date verification, or technical clarifications.