Sacramento River Erosion Contract 3

SOL #: W9123826BA006Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W075 ENDIST SACRAMENTO
SACRAMENTO, CA, 95814-2922, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Tunnels And Subsurface Structures (Y1LC)

Set Aside

No set aside specified

Timeline

1
Posted
Nov 20, 2025
2
Last Updated
Mar 3, 2026
3
Submission Deadline
Feb 10, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, US Army Corps of Engineers (USACE) Sacramento District, has issued a solicitation for Sacramento River Erosion Contract 3. This opportunity, identified under Product Service Code Y1LC (Construction Of Tunnels And Subsurface Structures), involves comprehensive erosion control work, including demolition, material removal, and site restoration. Amendment 0004 extends the Bid Due Date to February 10, 2026, at 11:00 AM PST, with a virtual bid opening at 2:00 PM PST on the same day.

Scope of Work

The contract requires the demolition and removal of existing items and materials from the project site, ensuring proper disposal and cleanup. Key tasks include:

  • Demolition or salvage of identified items and materials.
  • Daily removal of rubbish and debris, with provisions for temporary storage in contractor-provided areas if daily removal is not feasible.
  • Installation of various materials such as Graded Stone Type C, Soil-Filled Graded Stone Type C, Aggregate Base, Topsoil, Grass Seeding and Erosion Control, In-Stream Wood Material, and Beaver Barrier Fence.
  • Work must comply with EM 385-1-1, Section 23, DEMOLITION, and other applicable requirements.

Contract & Timeline

  • Type: Solicitation
  • Agency: DEPT OF THE ARMY, W075 ENDIST SACRAMENTO (USACE)
  • Title: Sacramento River Erosion Contract 3
  • Product Service Code: Y1LC - Construction Of Tunnels And Subsurface Structures
  • Set-Aside: None specified
  • Bid Due Date: February 10, 2026, 11:00 AM PST
  • Virtual Bid Opening: February 10, 2026, 2:00 PM PST
  • Published Date (Latest Amendment): January 26, 2026

Pricing & Payment Procedures

The contract outlines specific procedures for pricing and payment. Bidders must understand how various contract items will be paid and measured, including:

  • Single Job Payment Items: Mobilization and Demobilization, Temporary Storm Water Pollution Control, Clearing and Grubbing, and optional Boat Dock Removal items.
  • Unit Price Payment Items: Materials like Graded Stone, Aggregate Base, Topsoil, and Erosion Control elements, with specified measurement methods (e.g., cubic yard, ton, acre, linear foot).
  • Detailed invoice submission procedures, requiring specific documentation such as Prompt Payment Certification, preliminary payment worksheets, and updated schedules.

Key Requirements & Compliance

  • A Removal Plan must be submitted for approval before work commences, detailing procedures for removal, disposition of salvaged materials, utility disconnection, and operational sequences.
  • Authorization from the Contracting Officer is required before starting demolition.
  • Existing utilities must be maintained, and items to remain in place must be protected.
  • Disposal of removed materials must comply with all federal, state, and local regulations. Burning of materials on-site is prohibited.
  • Traffic control measures are required where safety is endangered.

Contact Information

People

Points of Contact

Files

Files

Download
Download
Download
View
View
View
View
View
View
View
View

Versions

Version 13
Solicitation
Posted: Mar 3, 2026
View
Version 12
Solicitation
Posted: Feb 20, 2026
View
Version 11
Solicitation
Posted: Feb 18, 2026
View
Version 10
Solicitation
Posted: Feb 5, 2026
View
Version 9
Solicitation
Posted: Feb 3, 2026
View
Version 8Viewing
Solicitation
Posted: Jan 26, 2026
Version 7
Solicitation
Posted: Jan 23, 2026
View
Version 6
Solicitation
Posted: Jan 20, 2026
View
Version 5
Solicitation
Posted: Jan 20, 2026
View
Version 4
Solicitation
Posted: Jan 8, 2026
View
Version 3
Solicitation
Posted: Jan 6, 2026
View
Version 2
Solicitation
Posted: Dec 16, 2025
View
Version 1
Pre-Solicitation
Posted: Nov 20, 2025
View