Sacramento River Erosion Contract 3
SOL #: W9123826BA006Solicitation
Overview
Buyer
DEPT OF DEFENSE
Dept Of The Army
W075 ENDIST SACRAMENTO
SACRAMENTO, CA, 95814-2922, United States
Place of Performance
Place of performance not available
NAICS
Other Heavy and Civil Engineering Construction (237990)
PSC
Construction Of Tunnels And Subsurface Structures (Y1LC)
Set Aside
No set aside specified
Original Source
Timeline
1
Posted
Nov 20, 2025
2
Last Updated
Mar 3, 2026
3
Submission Deadline
Feb 24, 2026, 7:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, Sacramento District, has issued Amendment 0005 for the Sacramento River Erosion Contract 3, extending the bid due date to February 24, 2026, at 11:00 PST. The virtual bid opening will follow on the same day at 14:00 PST. This solicitation seeks contractors for comprehensive erosion control work, which includes significant demolition and material removal components.
Scope of Work
This contract focuses on erosion control measures along the Sacramento River, encompassing:
- Demolition and Removal: This involves the demolition and removal of existing items and materials, ensuring proper disposal and site cleanup. Specific requirements include daily removal of rubbish and debris, management of materials that cannot be removed daily, and adherence to EM 385-1-1, Section 23.
- Erosion Control Elements: Installation of various materials such as Graded Stone Type C, Soil-Filled Graded Stone Type C, Aggregate Base, Topsoil, Grass Seeding and Erosion Control, In-Stream Wood Material, and Beaver Barrier Fence.
- Special Requirements: Contractors must obtain Contracting Officer authorization before commencing demolition, maintain existing utilities, protect items designated to remain, and submit a detailed Removal Plan for approval. Notification to relevant authorities, traffic control measures, and continuous evaluation of structural conditions are also mandated. The use of explosives is prohibited.
Contract & Timeline
- Opportunity Type: Solicitation
- Notice Identifier: d7f23bccaa4140e087d7640fa03290a7
- Product Service Code: Y1LC (Construction Of Tunnels And Subsurface Structures)
- Department/Office: DEPT OF DEFENSE / DEPT OF THE ARMY / W075 ENDIST SACRAMENTO
- Response Due Date: February 24, 2026, 11:00 PST
- Virtual Bid Opening: February 24, 2026, 14:00 PST
- Published Date: February 5, 2026 (Amendment 0005)
- Set-Aside: None specified.
Key Amendments & Pricing
- Amendment 0005 (Feb 5, 2026): Primarily extended the bid due date and virtual bid opening date. No other changes were made or implied by this amendment.
- Amendment 0003 (Jan 20, 2026): Revised Specification Section 01 22 00 ("Price and Payment Procedures") to incorporate "and disposal" for optional CLINs and their descriptions. It also introduced a new Specification Section 02 41 00 ("Demolition and Removals").
- Pricing & Payment Procedures (Section 01 22 00): This section details payment for single job items (e.g., Mobilization, Temporary Storm Water Pollution Control, Clearing and Grubbing, Option Item: Boat Dock Removal) and unit price items (e.g., various stone types, topsoil, seeding, in-stream wood, beaver barrier fence). It also outlines comprehensive invoice submission procedures, including required documentation and timelines.
Contact Information
For inquiries, contact Julie Maxwell at julie.maxwell@usace.army.mil or 916-557-7989.
People
Points of Contact
Julie MaxwellPRIMARY
Jennifer WheelisSECONDARY
Files
Versions
Version 13
Solicitation
Posted: Mar 3, 2026
Version 12
Solicitation
Posted: Feb 20, 2026
Version 11
Solicitation
Posted: Feb 18, 2026
Version 10Viewing
Solicitation
Posted: Feb 5, 2026
Version 9
Solicitation
Posted: Feb 3, 2026
Version 8
Solicitation
Posted: Jan 26, 2026
Version 7
Solicitation
Posted: Jan 23, 2026
Version 6
Solicitation
Posted: Jan 20, 2026
Version 5
Solicitation
Posted: Jan 20, 2026
Version 4
Solicitation
Posted: Jan 8, 2026
Version 3
Solicitation
Posted: Jan 6, 2026
Version 2
Solicitation
Posted: Dec 16, 2025
Version 1
Pre-Solicitation
Posted: Nov 20, 2025