Sacramento River Erosion Contract 3

SOL #: W9123826BA006Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W075 ENDIST SACRAMENTO
SACRAMENTO, CA, 95814-2922, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Tunnels And Subsurface Structures (Y1LC)

Set Aside

No set aside specified

Timeline

1
Posted
Nov 20, 2025
2
Last Updated
Mar 3, 2026
3
Submission Deadline
Feb 24, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, Sacramento District, has issued Amendment 0005 for the Sacramento River Erosion Contract 3, extending the bid due date to February 24, 2026, at 11:00 PST. The virtual bid opening will follow on the same day at 14:00 PST. This solicitation seeks contractors for comprehensive erosion control work, which includes significant demolition and material removal components.

Scope of Work

This contract focuses on erosion control measures along the Sacramento River, encompassing:

  • Demolition and Removal: This involves the demolition and removal of existing items and materials, ensuring proper disposal and site cleanup. Specific requirements include daily removal of rubbish and debris, management of materials that cannot be removed daily, and adherence to EM 385-1-1, Section 23.
  • Erosion Control Elements: Installation of various materials such as Graded Stone Type C, Soil-Filled Graded Stone Type C, Aggregate Base, Topsoil, Grass Seeding and Erosion Control, In-Stream Wood Material, and Beaver Barrier Fence.
  • Special Requirements: Contractors must obtain Contracting Officer authorization before commencing demolition, maintain existing utilities, protect items designated to remain, and submit a detailed Removal Plan for approval. Notification to relevant authorities, traffic control measures, and continuous evaluation of structural conditions are also mandated. The use of explosives is prohibited.

Contract & Timeline

  • Opportunity Type: Solicitation
  • Notice Identifier: d7f23bccaa4140e087d7640fa03290a7
  • Product Service Code: Y1LC (Construction Of Tunnels And Subsurface Structures)
  • Department/Office: DEPT OF DEFENSE / DEPT OF THE ARMY / W075 ENDIST SACRAMENTO
  • Response Due Date: February 24, 2026, 11:00 PST
  • Virtual Bid Opening: February 24, 2026, 14:00 PST
  • Published Date: February 5, 2026 (Amendment 0005)
  • Set-Aside: None specified.

Key Amendments & Pricing

  • Amendment 0005 (Feb 5, 2026): Primarily extended the bid due date and virtual bid opening date. No other changes were made or implied by this amendment.
  • Amendment 0003 (Jan 20, 2026): Revised Specification Section 01 22 00 ("Price and Payment Procedures") to incorporate "and disposal" for optional CLINs and their descriptions. It also introduced a new Specification Section 02 41 00 ("Demolition and Removals").
  • Pricing & Payment Procedures (Section 01 22 00): This section details payment for single job items (e.g., Mobilization, Temporary Storm Water Pollution Control, Clearing and Grubbing, Option Item: Boat Dock Removal) and unit price items (e.g., various stone types, topsoil, seeding, in-stream wood, beaver barrier fence). It also outlines comprehensive invoice submission procedures, including required documentation and timelines.

Contact Information

For inquiries, contact Julie Maxwell at julie.maxwell@usace.army.mil or 916-557-7989.

People

Points of Contact

Files

Files

Download
Download
Download
View
View
View
View
View
View
View
View

Versions

Version 13
Solicitation
Posted: Mar 3, 2026
View
Version 12
Solicitation
Posted: Feb 20, 2026
View
Version 11
Solicitation
Posted: Feb 18, 2026
View
Version 10Viewing
Solicitation
Posted: Feb 5, 2026
Version 9
Solicitation
Posted: Feb 3, 2026
View
Version 8
Solicitation
Posted: Jan 26, 2026
View
Version 7
Solicitation
Posted: Jan 23, 2026
View
Version 6
Solicitation
Posted: Jan 20, 2026
View
Version 5
Solicitation
Posted: Jan 20, 2026
View
Version 4
Solicitation
Posted: Jan 8, 2026
View
Version 3
Solicitation
Posted: Jan 6, 2026
View
Version 2
Solicitation
Posted: Dec 16, 2025
View
Version 1
Pre-Solicitation
Posted: Nov 20, 2025
View
Sacramento River Erosion Contract 3 | GovScope