Safety Shower and Eyewash Corrections Phase 1

SOL #: NB196000-26-00819Sources Sought

Overview

Buyer

Commerce
National Institute Of Standards And Technology
DEPT OF COMMERCE NIST
GAITHERSBURG, MD, 20899, United States

Place of Performance

Boulder, CO

NAICS

Plumbing (238220)

PSC

Maintenance Of Miscellaneous Buildings (Z1JZ)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 24, 2026
2
Last Updated
Feb 24, 2026
3
Response Deadline
Mar 12, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Institute of Standards and Technology (NIST), under the Department of Commerce, is conducting a Sources Sought / Request for Information (RFI) for Safety Shower and Eyewash Corrections Phase 1 at its Boulder, CO Campus. This Design-Build project aims to bring existing emergency eyewash and safety shower fixtures into compliance with ANSI Z358.1-2014 standards. Responses are due by March 12, 2026, at 4:00 PM Mountain.

Scope of Work

This Design-Build effort involves correcting deficiencies in safety shower and eyewash fixtures across multiple buildings at the NIST Boulder Campus. The project is structured with a base scope and two options:

  • Base Scope (CLIN 0001 - Building 22, Room 1203): Design and construction to add hot water to an existing eyewash/shower unit, including plumbing modifications, installation of a thermostatic mixing valve (TMV), and tempered water connections.
  • Option 1 (CLIN 0002 - Building 25, Room 1300 & Room 117): Design and construction to add hot water to an existing eyewash/shower unit in Room 1300. Additionally, a new ANSI Z358.1-2014 compliant eyewash fixture will be added to Room 117, requiring new infrastructure, TMV, and tempered water connections.
  • Option 2 (CLIN 0003 - Building 2): Design and construction to install a new tempered water loop to serve 25 existing safety fixtures, ensuring compliance with temperature and flow requirements. This may involve a heat exchanger, circulation pump, TMV, distribution piping, and modifications to existing fixtures.

All work must minimize impacts on occupants and infrastructure in occupied spaces.

Key Requirements

  • Compliance: All repaired and new fixtures must comply with ANSI Z358.1-2014. Testing is required before and after work, witnessed by NIST staff.
  • Design-Build: The contractor must provide professional architectural and engineering services, including design, construction plans, and specifications.
  • Coordination: Extensive coordination with the Contracting Officer's Representative (COR) and building occupants is required.
  • Utility Outages: Major utility outages are limited to 8 hours and must occur during semi-annual site shutdowns (May/September), with 10-weeks advance notice.
  • Personnel: Key personnel (Project Manager, Site Superintendent, Safety Manager) require a minimum of 10 years of experience.
  • Safety & Security: A site-specific Safety Plan, OSHA compliance, and adherence to HSPD-12 and NIST identification/access requirements are mandatory.

Submission Details

  • Content: Interest and Capability statements, including cut sheets, drawings, and previous installation examples.
  • Page Limit: Limited to 20 pages (Times New Roman, 12pt font, 8.5x11; 11x17 acceptable for cut sheets/drawings).
  • Required Information: Company name, UEI, address, phone number, fax number, email address, and business size status for NAICS 238220.
  • Format: Submit via email to the contract specialist. Allowed attachments: .pdf, .doc, .docx, .xsls, or .xls. No .zip or .exe files.
  • Email Subject: "Source Sought: Safety Shower and Eyewash Corrections Phase 1".
  • Proprietary Information: Must be clearly marked and segregated.

Contract & Timeline

  • Type: Sources Sought / Request for Information (RFI)
  • NAICS: 238220 - Plumbing, Heating, and Air-Conditioning Contractors (SBA size standard: $19.0 million)
  • Response Due: March 12, 2026, at 4:00 PM Mountain
  • Published: February 24, 2026
  • Point of Contact: Shawn Borisow (shawn.borisow@nist.gov)

Additional Notes

This is for information and planning purposes only and does not constitute a solicitation or promise to issue one. The Government will not pay for any information or administrative costs incurred. Not responding does not preclude participation in a future solicitation.

People

Points of Contact

Shawn BorisowPRIMARY

Files

Files

Download
Download

Versions

Version 2Viewing
Sources Sought
Posted: Feb 24, 2026
Version 1
Sources Sought
Posted: Feb 24, 2026
View
Safety Shower and Eyewash Corrections Phase 1 | GovScope