Santa Margarita River Levee System Repair, Marine Corps Air Station Camp Pendleton, CA
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, USACE Los Angeles District, is conducting a Sources Sought market survey for the Santa Margarita River Levee System Repair at Marine Corps Air Station Camp Pendleton, CA. This notice aims to identify qualified firms for a project estimated between $100,000,000 and $250,000,000. Responses are due by February 3, 2026.
Scope of Work
This project involves significant repairs and improvements to the approximately 3-mile-long Santa Margarita River (SMR) Levee System, originally constructed between 1998-2001. The levee system, comprising West, Air Station, and East segments, along with a Floodwall and Pump Station, requires extensive work due to minimal maintenance and heavy vegetation overgrowth. Key anticipated repairs include:
- Levee raise (2.5-4.5 feet) with soil cement, including a stability berm.
- Installation of relief wells on the Air Station Segment.
- Replacement or abandonment of existing toe drains.
- Construction of a graded gravel filter ditch.
- Scour and erosion mitigation using launch stone armoring (36-inch diameter graded stone, 5-8 feet high).
- Strengthening and improving the existing Floodwall Structural with rebar and concrete.
- Filling existing cracks with cement grout.
- Construction of 10-12 feet wide maintenance paths and ramps.
- 15-foot-wide vegetation clearance pathway and restoration.
- NEPA and Environmental Compliance, and Air Station Camp Pendleton Compliance. Approximately 50,000 cubic yards of materials will be used, requiring an onsite soil cement batch plant. The estimated total contract performance period is 1096 calendar days.
Contract & Timeline
- Type: Sources Sought / Market Survey
- NAICS: 237990 (Other Heavy and Civil Engineering Construction), Small Business Size Standard: $36.5M
- Estimated Value: $100,000,000 - $250,000,000
- Performance Period: 1096 calendar days (approx. 3 years)
- Set-Aside: To be determined based on market research; seeking information from Large, Small, HUBZone, 8(a), Women-owned, Economically Disadvantaged Women-owned, and Service-Disabled Veteran-owned firms.
- Response Due: February 3, 2026, 4:30 PM PST
- Published: February 9, 2026
- Industry Day: March 10, 2026, at Camp Pendleton, CA (details to follow).
Submission Requirements
Interested firms should submit answers to questions found in the PIEE solicitation module. Prior Government contract work is not required. All firms must be registered in SAM.gov. No hard copy or facsimile submissions will be accepted.
Contact Information
Questions concerning submissions should be directed to Mr. Michael Robinson at Michael.G.Robinson@usace.army.mil.