Scott Inn HVAC Preventative Maintenance Requirement

SOL #: FA440726Q0100Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4407 375 CONS LGC
SCOTT AFB, IL, 62225-5015, United States

Place of Performance

Scott Air Force Base, IL

NAICS

Plumbing (238220)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Refrigeration, Air Conditioning, And Air Circulating Equipment (J041)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 2, 2026
2
Last Updated
Feb 25, 2026
3
Submission Deadline
Feb 25, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force (375 CONS) is soliciting quotes for preventative maintenance (PM), inspection, and repair services for HVAC systems at Building 1812 (Scott Inn), located at Scott AFB, IL. This is a Non-Appropriated Funds (NAF) acquisition intended to ensure optimal performance, energy efficiency, and system longevity. Quotes are due by February 25, 2026.

Scope of Work

The contractor shall provide all labor, tools, and materials to maintain various HVAC components, including Rooftop Units, Boilers, Chillers, Cooling Towers, and the Metasys Building Automation System. Key tasks include:

  • Quarterly and Annual PM: Scheduled inspections, cleaning, and filter replacements.
  • Water Treatment: Quarterly testing and chemical balancing.
  • Emergency Repairs: 24/7 response capability with a 2-hour on-site requirement.
  • System Support: Maintenance of sump holding tanks and water softener systems.

Contract & Timeline

  • Type: Firm-Fixed-Price (for PM) and Time & Materials (for repairs).
  • Duration: One base year (starting March 1, 2026) plus four 12-month option periods.
  • Set-Aside: Full and Open Competition.
  • Response Due: February 25, 2026, at 12:00 PM CST.
  • Site Visit: Scheduled for February 17, 2026, at 10:00 AM CST.

Evaluation

Award will be made using a Best Value Subjective Trade-off process. Non-price factors—Technical Approach and Past Performance—are combined and considered more important than price. Technical Approach will be evaluated on an Acceptable/Unacceptable basis.

Additional Notes

Contractor personnel must be certified for the Metasys system and confined space entry. Base access requires REAL ID compliance; sponsorship requests for the site visit must be submitted by February 12, 2026.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Feb 25, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Feb 23, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Feb 5, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Jan 2, 2026
View
Scott Inn HVAC Preventative Maintenance Requirement | GovScope