Solicitation/Synopsis for Ground Hop Kit, NSN: 2920-01-700-1933

SOL #: W912CH-25-R-0219Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC- DTA
WARREN, MI, 48397-5000, United States

Place of Performance

Place of performance not available

NAICS

Motor Vehicle Electrical and Electronic Equipment Manufacturing (336320)

PSC

Engine Electrical System Components, Nonaircraft (2920)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 25, 2026
2
Last Updated
May 5, 2026
3
Submission Deadline
May 11, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The United States Army Contracting Command – Detroit Arsenal (ACC-DTA) is soliciting proposals for a Firm Fixed-Price (FFP) contract to procure Ground Hop Kits (NSN: 2920-01-700-1933, Part Number: 57K7985). This is a Total Small Business Set-Aside for a one-time buy with a 100% option. Proposals are due May 11, 2026.

Scope of Work

This opportunity requires the supply of 35 Ground Hop Kits, with an option for an additional 100% of the quantity. The procurement includes specific requirements for Military Packaging - Level A and adherence to associated Special Packaging Instructions (SPIs). The FOB Point has been updated to Destination per Amendment 0002.

Contract Details

  • Contract Type: Firm Fixed-Price (FFP), one-time buy with 100% option.
  • NAICS Code: 336320 (Motor Vehicle Electrical and Electronic Equipment Manufacturing).
  • Delivery: 270 Days After Contract (DAC) or First Article Test (FAT) Approval, whichever is later.
  • Top Drawing Date: Updated to 28-APR-2025 for CLINs 0001AA and 0002AA (Amendment 0003).

Key Requirements

  • Technical Data Package (TDP): An EXPORT CONTROLLED TDP (Distribution D) is available via SAM.gov. Access requires Joint Certification Program (JCP) Certification (DD 2345). Bidders must download the TDP and monitor for updates.
  • First Article Test (FAT): A FAT is required. A "First Article Waiver Worksheet" is provided for contractors to request a full or partial waiver with justification.
  • Technical Information Questionnaire (TIQ): Bidders must complete a TIQ to demonstrate technical acceptability, confirming compliance with specific Qualified Products List (QPL) requirements for the Ground Hop Kit and its components (e.g., wiring harnesses, MIL-DTL-23053). Required evidence includes documentation like quotes or invoices from qualified suppliers.
  • Qualified Parts: Be aware that some parts must be procured from specific vendors.

Submission & Evaluation

  • Submission Method: Proposals must be submitted electronically via email to Contract Specialist Zachary Wiegand (zachary.k.wiegand.civ@army.mil).
  • Evaluation Criteria: Lowest Price Technically Acceptable (LPTA). Proposals will be evaluated on two factors: Technical (Acceptable/Unacceptable based on TIQ and substantiating documentation) and Price (reasonableness and Total Evaluated Price).
  • Eligibility: This is a Total Small Business Set-Aside. Offerors must be registered in SAM.gov and self-certified to NAICS code 336320.
  • Minimum Acceptance Period: 180 calendar days.

Important Dates

  • Questions Due: April 17, 2026, 12:00 PM EST.
  • Proposal Due: May 11, 2026, 08:00 PM EDT.
  • Contact: Zachary Wiegand, zachary.k.wiegand.civ@army.mil, 571-588-9382.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 10
Combined Synopsis/Solicitation
Posted: May 5, 2026
View
Version 9
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
View
Version 7Viewing
Combined Synopsis/Solicitation
Posted: Apr 13, 2026
Version 6
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Apr 2, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 1, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 27, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View
Version 1
Solicitation
Posted: Mar 25, 2026
View