Solicitation Notice: ERCIP Rock Island Arsenal Microgrid

SOL #: W912QR26RA044Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W072 ENDIST LOUISVILLE
LOUISVILLE, KY, 40202-2230, United States

Place of Performance

IL

NAICS

Power and Communication Line and Related Structures Construction (237130)

PSC

Construction Of Other Utilities (Y1NZ)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 20, 2026
2
Last Updated
Jun 4, 2026
3
Submission Deadline
Jun 4, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, Louisville District (USACE), is soliciting proposals for the Energy Resilience Conservation Investment Program (ERCIP) Rock Island Arsenal (RIA) Microgrid and Power project in Rock Island, IL. This Design-Bid-Build (DBB) project aims to construct a microgrid system to ensure sustained power and uninterrupted support for the Advanced Manufacturing Center of Excellence. The project magnitude is anticipated to be between $25 million and $100 million, expected at the upper end. Proposals are due June 4, 2026, at 01:00 PM local time.

Scope of Work

The project involves integrating the existing 2.8 MW hydroelectric power plant with new power generation and storage components. Key requirements include:

  • Construction of a microgrid system comprising 14 MW natural gas-fired Reciprocating Internal Combustion Engine (RICE) generators, 3 MW solar photovoltaic (PV) panels, and a 400 kW/1.6 MWh Energy Storage System (ESS).
  • Connection of the new microgrid switchgear to Substation A.
  • Construction of a supporting facility for the microgrid system.
  • Relocation of hydroplant feeders from Substation A to the new microgrid switchgear.
  • Commissioning of the entire microgrid system, including electrical and mechanical equipment, facilities, and utilities.
  • Installation and certification of all required software for substation operation.

Contract Details

  • Contract Type: Firm-Fixed-Price (FFP).
  • NAICS Code: 237130, Power and Communication Line and Related Structures Construction (size standard $45,000,000).
  • Period of Performance: 902 calendar days after Notice to Proceed.
  • Set-Aside: Full and Open with a HUBZone price evaluation preference.
  • CMMC Requirement: Mandatory CMMC Level 2 (Self) is required prior to award for each contractor information system processing FCI/CUI.
  • Access to Documents: Restricted solicitation documents (CUI/FCI) require an active SAM Registration and a current BASIC confidence level in SPRS. Firms must email Jacob Pridemore and Bjorn Hale with CAGE Code and UEI to request access.

Submission & Evaluation

  • Submission Deadline: June 4, 2026, 01:00 PM local time.
  • Submission Method: Electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module.
  • Basis of Award: Best Value Trade-Off process. Evaluation factors (Past Performance, Management Plan, Small Business Participation Plan) are considered approximately equal to price.
  • Inquiries: Submit bidder inquiries through ProjNet as per solicitation instructions.

Additional Notes

  • Funds are not presently available; award is contingent upon appropriated funds.
  • A site visit was held on May 6, 2026, and the sign-in sheet has been posted.
  • Offerors must comply with NIST SP 800-171 requirements.

People

Points of Contact

Files

Files

Download
Download

Versions

Version 5
Solicitation
Posted: Jun 4, 2026
View
Version 4
Solicitation
Posted: Jun 4, 2026