Solicitation Notice: ERCIP Rock Island Arsenal Microgrid

SOL #: W912QR26RA044Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W072 ENDIST LOUISVILLE
LOUISVILLE, KY, 40202-2230, United States

Place of Performance

IL

NAICS

Power and Communication Line and Related Structures Construction (237130)

PSC

Construction Of Other Utilities (Y1NZ)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 20, 2026
2
Last Updated
Jun 4, 2026
3
Submission Deadline
Jun 18, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, Louisville District is soliciting proposals for the Energy Resilience Conservation Investment Program (ERCIP) Rock Island Arsenal Microgrid and Power project in Rock Island Arsenal, IL. This Design-Bid-Build (DBB) construction project aims to establish a resilient microgrid system to ensure sustained power for the Arsenal, particularly during utility outages. The estimated magnitude is between $25 million and $100 million, expected at the upper end.

Scope of Work

The project involves the construction of a comprehensive microgrid system. Key components include:

  • Integration with the existing 2.8 MW hydroelectric power plant.
  • Installation of 14 MW of natural gas-fired Reciprocating Internal Combustion Engine (RICE) generators.
  • Deployment of 3 MW of solar photovoltaic (PV) panels.
  • Implementation of a 400 kW/1.6 MWh Energy Storage System (ESS).
  • Construction of a supporting facility, connection to Substation A, and relocation of hydroplant feeders.
  • Commissioning of the entire system, including electrical, mechanical, and software components. Specific brand-name components, justified for compatibility, include Schweitzer Electronic Laboratories (SEL) for power system protection, Allen-Bradley for SCADA integration, Mid-American for natural gas service, and Simplex for fire alarm panels.

Contract Details

  • Contract Type: Firm-Fixed-Price (FFP)
  • NAICS Code: 237130, Power and Communication Line and Related Structures Construction (Size Standard: $45,000,000)
  • Period of Performance: 902 calendar days after Notice to Proceed.
  • Set-Aside: Full and Open procurement with a HUBZone price evaluation preference.
  • CMMC Requirement: CMMC Level 2 (Self) is mandatory prior to award.

Submission & Evaluation

  • Proposal Due Date: June 18, 2026, at 3:00 PM Eastern Daylight Time.
  • Submission Method: Electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module.
  • Evaluation Basis: Best Value Trade-Off, where non-price factors (Past Performance, Management Plan, Small Business Participation Plan) are approximately equal to price.
  • Restricted Documents: Access to the full solicitation package (drawings/specifications) requires an active SAM registration and a current BASIC confidence level in the Supplier Performance Risk System (SPRS). Requests must be emailed to Jacob Pridemore and Bjorn Hale (jacob.s.pridemore@usace.army.mil, bjorn.t.hale@usace.army.mil) with company CAGE Code and UEI.

Important Notes

  • Amendment 0001 extended the proposal due date, updated specifications and drawings, revised wage decisions, and incorporated a new FAR clause (52.222-90). Offerors must ensure proposals reflect all updates.
  • A site visit was held on May 6, 2026.
  • Funds are not presently available; award is contingent upon appropriated funds.
  • Inquiries should be submitted through ProjNet as per solicitation instructions.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Solicitation
Posted: Jun 4, 2026
Version 4
Solicitation
Posted: Jun 4, 2026
View
Version 3
Solicitation
Posted: May 12, 2026
View
Version 2
Solicitation
Posted: Apr 27, 2026
View
Version 1
Solicitation
Posted: Apr 20, 2026
View