FYSU Water Mgt Plan Development, Maint, Verification, and Legionella Testing Services

SOL #: IHS1521987Solicitation

Overview

Buyer

Health And Human Services
Indian Health Service
PHOENIX AREA INDIAN HEALTH SVC
PHOENIX, AZ, 85004, United States

Place of Performance

Winterhaven, CA

NAICS

Environmental Consulting Services (541620)

PSC

Environmental Studies And Assessments (B510)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 15, 2025
2
Last Updated
Jan 15, 2026
3
Submission Deadline
Jan 16, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

***Submission deadline extended through January 16, 2026, at 1:00 PM EST***

The Indian Health Service (IHS), Fort Yuma Health Center (FYHC), is soliciting quotations from qualified
Small Business vendors to provide comprehensive Water Management Plan (WMP) development,
maintenance, verification, and water testing services for existing mechanical and domestic water systems.
The contractor shall develop a new, facility-wide WMP during the base year and provide ongoing
maintenance and updates during option years. Services include quarterly and semi-annual verification site
visits, cooling tower sampling, and domestic water sampling for Legionella, heterotrophic plate count
(HPC), and E. coli. The period of performance includes a base year and four option years. The WMP shall
comply with ANSI/ASHRAE Standard 188-2021, CMS QSO 17-30, CDC guidance, CDPH AFL 18-39, the
USEPA Safe Drinking Water Act, and applicable Environment of Care standards. The contractor shall
perform system identification, hazard analysis, control measure planning, monitoring, corrective action
planning, and testing for cooling towers, domestic water systems, and associated mechanical equipment.
The contractor shall provide all labor, supervision, materials, tools, travel, equipment, and expertise
necessary to ensure FYHC water systems remain compliant, safe, and effectively managed throughout
the period of performance.

People

Points of Contact

Minkyu KimPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: Jan 15, 2026
Version 2
Solicitation
Posted: Jan 7, 2026
View
Version 1
Sources Sought
Posted: Dec 15, 2025
View
FYSU Water Mgt Plan Development, Maint, Verification, and Legionella Testing Services | GovScope