SOURCES SOUGHT NOTICE FOR DESIGN-BID-BUILD (DBB) PHASE III GROUNDWATER TREATMENT PLANT CONSTRUCTION, NWIRP BETHPAGE, WANTAGH, NEW YORK

SOL #: N4008526R0045Special Notice

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Wantagh, NY

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Water Supply Facilities (Y1NE)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 20, 2026
2
Last Updated
Feb 12, 2026
3
Action Date
Feb 19, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Naval Facilities Engineering Systems Command, Mid-Atlantic is conducting market research through a Sources Sought Notice for a Design-Bid-Build (DBB) Phase III Groundwater Treatment Plant (GWTP) construction project at NWIRP Bethpage, Wantagh, New York. This is not a solicitation, but aims to identify eligible firms (large and small businesses) capable of performing the required services. Responses will inform the government's acquisition strategy, including potential set-asides.

Project Scope

The project involves the complete construction and commissioning of a new GWTP designed to intercept and treat a contaminated groundwater plume (containing chlorinated VOCs and 1,4-dioxane) originating from the former NWIRP and Northrop Grumman properties. The treatment process will include sand filters, an Advanced Oxidation Process (AOP), and Granular Activated Carbon (GAC) to meet drinking water standards.

Key work requirements include:

  • Construction of three groundwater recovery wells and associated underground piping.
  • Installation of large storage tanks, multiple filter types, AOP system, and GAC units.
  • Construction of two new buildings (treatment plant and office).
  • All necessary structural, electrical, plumbing, buried piping, pavements, site utilities, fencing, and fire protection systems.

Contract Details

  • Estimated Magnitude: Between $25,000,000 and $100,000,000.
  • NAICS Code: 237110, Water and Sewer Line and Related Structures Construction, with a small business size standard of $45,000,000.
  • Procurement Method: Federal Acquisition Regulation (FAR) Part 15, Contracting by Negotiation.
  • Anticipated Award: September 2026.
  • Set-Aside: To be determined based on market research. If set aside for small businesses, FAR clause 52.219-14 (Limitations on Subcontracting) will apply, requiring the prime to perform at least 15% of the contract cost (excluding materials).

Submission Requirements & Evaluation

Interested firms must submit responses using the provided "Sources Sought Contractor Information Form" and "Project Information Form." Submissions must be electronic to shayna.t.eichner.civ@us.navy.mil, limited to a 4MB attachment.

Required information includes:

  • Contractor details (UEI, CAGE Code, contact info).
  • Type of Business (e.g., Small Business, 8(a), HUBZone, SDVOSB, WOSB, EDWOSB).
  • Bonding Capacity (surety name, max per project, aggregate max).
  • Construction Experience: Submit 2-5 relevant projects completed within the last seven years as a prime contractor. Projects must have a final construction cost of $20,000,000 or greater and demonstrate experience with Water/Wastewater/Groundwater Treatment Facilities for remediation or water quality. Collective experience should cover phased construction, utility plants near residential areas, startup of large GWTPs (>= 2 MGD), and specific treatment systems (iron filtration, GAC, AOP).

Key Dates

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Special Notice
Posted: Feb 12, 2026
Version 1
Sources Sought
Posted: Jan 20, 2026
View
SOURCES SOUGHT NOTICE FOR DESIGN-BID-BUILD (DBB) PHASE III GROUNDWATER TREATMENT PLANT CONSTRUCTION, NWIRP BETHPAGE, WANTAGH, NEW YORK | GovScope