USS GRIDLEY (DDG 101) FY27 Depot Modernization Period

SOL #: N0002426R4414Pre-Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSEA HQ
WASHINGTON NAVY YARD, DC, 20376-5000, United States

Place of Performance

Place of performance not available

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (West) Ship Repair (Including Overhauls And Conversions) Performed On. Non Nuclear Propelled And Nonpropelled Ships West Of The 108th Meridian (J999)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 14, 2026
2
Last Updated
May 19, 2026
3
Response Deadline
May 5, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Naval Sea Systems Command (NAVSEA) intends to issue solicitation N00024-26-R-4414 for the USS GRIDLEY (DDG 101) FY27 Depot Modernization Period (DMP). This presolicitation outlines the requirement for a contractor to execute a comprehensive CNO Availability to return the ship to a mission-ready state. The anticipated Firm-Fixed Price solicitation is expected to be released on or around May 5, 2026. This opportunity is for coast-wide (West) competition.

Scope of Work

The USS GRIDLEY (DDG 101) DMP will be approximately 20 months, starting in March 2027 and completing in November 2028. The scope includes all labor, supervision, production, testing, and quality assurance for ship maintenance, repair, and modernization. Key modernization efforts include SLQ-32(V)7, Mk 6 Mod X, TTWCS V5.6.2.X, AWS TI-16, AN/SQQ-89A(V)15, and various NAVSEA Program Alts. Extensive maintenance requirements cover hull structure, propulsion plant, electric plant, command and surveillance systems, auxiliary systems, outfit and furnishings, and armament. The prime contractor must provide an integrated production schedule incorporating AIT, 3rd Party contractors, and Government workload.

Contract & Timeline

  • Opportunity Type: Presolicitation
  • Anticipated Contract Type: Firm-Fixed Price supply contract
  • Duration: Approximately 20 months (March 2027 - November 2028)
  • Set-Aside: None specified (open competition, coast-wide West)
  • Anticipated Solicitation Release: On or around May 5, 2026
  • Published Date: April 20, 2026

Place of Performance

Competition will be on a coast-wide (West) basis. The facility must accommodate a DDG51 Class Ship, requiring a pier length greater than 509 ft, specific electrical, potable water, sea water, sewage, and compressed air capabilities, and a dry dock.

Special Requirements

This CNO Availability requires a highly capable contractor with substantial human resources for completing, coordinating, and integrating multiple areas of ship maintenance, repair, and modernization. Offerors must be registered in the Solicitation Module in SAM to be eligible for award. This synopsis is for informational purposes only and does not constitute a commitment to issue a solicitation or award a contract.

Contact Information

People

Points of Contact

Files

Files

Download

Versions

Version 4
Solicitation
Posted: May 19, 2026
View
Version 3
Solicitation
Posted: May 5, 2026
View
Version 2Viewing
Pre-Solicitation
Posted: Apr 20, 2026
Version 1
Special Notice
Posted: Apr 14, 2026
View