SPE60425R0406 - New England 2026 - Solicitation A0003

SOL #: SPE60425R0406Solicitation

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DLA ENERGY
FORT BELVOIR, VA, 22060, United States

Place of Performance

Place of performance not available

NAICS

Fossil Fuel Electric Power Generation (221112)

PSC

Fuel Oils (9140)

Set Aside

No set aside specified

Timeline

1
Posted
Oct 2, 2025
2
Last Updated
Feb 25, 2026
3
Submission Deadline
Nov 4, 2025, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency Energy (DLA Energy) has issued Solicitation SPE60425R0406 Amendment A0003 for the supply of retail electricity and ancillary services to various Department of Defense and Federal Civilian Agency facilities in the Independent System Operator New England (ISO-NE) market area. This is a Small Business Set-Aside. Non-price proposals are due November 4, 2025.

Scope of Work

This Request for Proposal (RFP) seeks qualified contractors to provide a 24-month supply and transmission of retail electricity and ancillary services. Services include managing scheduling, supply, transmission, and distribution, ensuring compliance with applicable tariffs, NERC regions, and utility regulations. The contractor must also maintain records for billing and provide interval data. Cybersecurity requirements, including a CMMC Level 1 Self-Assessment for Federal Contract Information (FCI), are mandatory.

Contract Details

  • Contract Type: Firm Fixed-Price Requirements Type and Fixed-Price Requirements Type utilizing Locational Marginal Price (LMP) for specific Contract Line Item Numbers (CLINs).
  • Period of Performance: 24-month delivery period, from the May 2026 meter read date through the May 2028 meter read date.
  • Estimated Quantity: The total estimated quantity is 305,880,778 kWh.
  • NAICS Code: 221112 (Fossil Fuel Electric Power Generation) with a size standard of 950 employees.
  • Product Service Code: 9140 (Fuel Oils), specifically for Electricity and Ancillary Services.

Eligibility & Evaluation

  • Set-Aside: This acquisition is a Small Business Set-Aside.
  • Eligibility: Offerors must be on the approved list of Retail Electric Providers in the states where the award is to be made. An active registration in SAM.gov is required at the time of proposal submission and award. Offerors must not appear on the OFAC SDN List, BIS DPL, or be listed as an exclusion within SAM.
  • Evaluation Factors: Proposals will be evaluated based on Past Performance, Technical Capability/Risk, Small Business Participation, and Price. Past Performance is the most important non-price factor.

Submission Requirements

  • Non-Price Proposal Due Date: November 4, 2025, at 01:00 PM Local Time.
  • Pricing Submission: Via a reverse auction on a date to be determined and announced via amendment.
  • Questions Deadline: October 17, 2025.
  • Contact: Jemri Sacasas at dlaenergy.eteam@dla.mil. For Small Business issues, contact 571-767-9465/9400 or dla.energy.osbp@dla.mil.

Key Amendments & Updates (A0003)

Amendment 0003, issued on January 27, 2026, significantly updated the solicitation. Key changes include a reduction in the overall estimated quantity to 305,880,778 kWh, refined language for the Locational Marginal Price (LMP) structure (specifically regarding Day-Ahead Ancillary Services Initiative (DASI) costs and ISO New England Market Rule 1 references), and special invoicing language. Attachment I - Installation Data Sheet (A0003) has been updated to reflect these account and quantity changes. Offerors must review the latest documents to ensure compliance.

People

Points of Contact

Jemri SacasasPRIMARY
DLA EnergySECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 9
Solicitation
Posted: Feb 25, 2026
View
Version 8
Solicitation
Posted: Feb 25, 2026
View
Version 7
Solicitation
Posted: Feb 25, 2026
View
Version 6
Solicitation
Posted: Feb 18, 2026
View
Version 5Viewing
Solicitation
Posted: Jan 27, 2026
Version 4
Solicitation
Posted: Dec 4, 2025
View
Version 3
Solicitation
Posted: Nov 17, 2025
View
Version 2
Solicitation
Posted: Nov 17, 2025
View
Version 1
Solicitation
Posted: Oct 2, 2025
View