The purpose of this solicitation is to repair a dr
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS) has issued a solicitation for the Rehabilitate Battlefield Interpretive Experience - Unforeseen Water Drainage at Tour Stop 7 project at Saratoga National Historical Park in Stillwater, NY. This project addresses groundwater seep drainage issues through grading and infrastructure improvements. Proposals are due February 17, 2026.
Scope of Work
The contractor will provide all labor, materials, and equipment for:
- Drainage Infrastructure: Installation of swales, stone drainage layers, geotextiles, underdrains, stormwater piping, and drain basins.
- Site Work: Fine grading, erosion control blanket installation, and landscape restoration through seeding.
- Pavement: Saw cutting, asphalt removal, milling, and full-depth asphalt replacement or overlay.
- Archeological Monitoring: Mandatory monitoring of all ground-disturbing activities, including background research, artifact cataloging, and reporting to meet Section 106 obligations.
Contract & Timeline
- Type: Firm Fixed-Price
- Duration: 60 calendar days after Notice to Proceed (NTP)
- Set-Aside: Total Small Business Set-Aside
- Estimated Start: March 16, 2026
- Proposal Due: February 17, 2026, at 11:00 AM EST
- Site Visit: A virtual site visit is scheduled for February 5, 2026, at 1:00 PM EST via Microsoft Teams.
Evaluation
Award will be made using the Best Value Continuum Tradeoff Process. Evaluation factors include:
- Technical Approach
- Schedule
- Past Performance
- Price
Additional Notes
Work hours are generally limited to 7:00 AM to 5:00 PM, Monday through Friday. The Tour Stop 07 parking lot will be closed to the public during construction, but the contractor must maintain pedestrian access to hiking trails and restrooms. Performance bonds are required for this project.