Y--The purpose of this solicitation is to repair a dr
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Interior, National Park Service (NPS), through its DSC Contracting Services Division, is soliciting proposals for a Design Bid-Build contract to repair a groundwater seep drainage issue at Tour Stop 7, Saratoga National Historical Park, NY. This is a Total Small Business Set-Aside. Proposals are due by February 17, 2026, at 11:00 AM EST.
Scope of Work
The project, identified as "SARA 257238 Repair Drainage Issue Tour Stop 7," involves comprehensive construction services. Key deliverables include:
- Drainage System Installation: Grading, installation of a new drainage system comprising swales, stone drainage layers, geotextile, underdrains, stormwater piping, drain basins, soil layers, stone cobble, and flared end sections.
- Site Restoration: Fine grading, installation of erosion blankets, and seeding to restore the landscape.
- Pavement Work: Saw cutting, asphalt removal, milling, and full-depth asphalt replacement/overlay.
- Archeological Monitoring: Mandatory archeological monitoring services during all ground-disturbing activities, including background research, artifact cataloging using the Interior Collection Management System (ICMS), data management according to NPS GIS Guidelines, and preparation of reports compliant with Section 106 of the National Historic Preservation Act.
- Adherence to various Federal Acquisition Regulation (FAR) clauses, OSHA safety standards, and environmental protection measures. Tree removal will be performed by others prior to construction.
Contract Details
This is anticipated to be a Firm Fixed-Price contract. The period of performance and substantial completion are required within 60 days after the Notice to Proceed. The project will be constructed under a single prime contract in one phase. Performance bonds are required, but no bid guarantee is necessary. Bidders must account for prevailing wage rates and fringe benefits for construction trades in New York State, as detailed in the provided Wage Determination. The small business size standard for this opportunity is $45.0 Million.
Submission & Evaluation
Proposals must be submitted via email by February 17, 2026, at 11:00 AM EST. Offerors are required to submit proposals in two volumes: Volume I (Technical Proposal) and Volume II (Business and Price Proposal). The evaluation will utilize a Best Value Continuum Tradeoff Process, considering technical approach, schedule, past performance, and price. A virtual site visit was held on February 5, 2026, and questions and answers from this event have been provided in Amendments 0001 and 0002. Offerors must be registered in the System for Award Management (SAM).
Place of Performance
The work will be conducted at Tour Stop 7, Saratoga National Historical Park, Saratoga County, Stillwater, New York.
Contact Information
For questions, contact Linda Melnick (linda_melnick@nps.gov) or Charles Thompson.