The Radford Army Ammunition Plant (RFAAP) Modernized Pre-Mix and Nitro Cellulose (NC) Dehydration NG3 Facilities
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Mission and Installation Contracting Command - Fort Drum is procuring Architect-Engineer (A-E) Design Services for the Modernized Pre-Mix and Nitro Cellulose (NC) Dehydration NG3 Facilities at Radford Army Ammunition Plant (RFAAP). This is an A-E Synopsis conducted under the Brooks Architect-Engineer Act. This opportunity is a Total Small Business Set-Aside. Responses are due April 13, 2026.
Scope of Work
The objective of this project is to prepare a 30% design for the Nitro Cellulose (NC) Dehydration (including NC Shredding) and Pre-Mix facilities at RFAAP. The design must incorporate the most modern, safe, environmentally friendly, and automated technologies to the maximum extent feasible.
Contract & Timeline
- Type: A-E Synopsis (Architect-Engineer Design Services)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Product/Service Code: C1EA (Architect And Engineering Construction: Ammunition Facilities)
- Response Due: April 13, 2026, 7:00 PM ET
- Published: March 12, 2026, 5:15 PM ET
- Department/Agency: DEPT OF DEFENSE / DEPT OF THE ARMY
- Office: W6QM MICC-FT DRUM
Evaluation
This procurement will be negotiated on the basis of demonstrated competence and qualifications for the required professional services, in accordance with the Brooks Architect-Engineer Act (40 U.S.C Section 1102) and FAR subpart 36.102.
Additional Notes
No specific content summaries were provided for the listed documents, which primarily consist of links and training materials for the PIEE Solicitation Module.