The Radford Army Ammunition Plant (RFAAP) Modernized Pre-Mix and Nitro Cellulose (NC) Dehydration NG3 Facilities

SOL #: W911S226RA005Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC-FT DRUM
FORT DRUM, NY, 13602-5220, United States

Place of Performance

Place of performance not available

NAICS

Engineering Services (541330)

PSC

Architect And Engineering Construction: Ammunition Facilities (C1EA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 9, 2026
2
Last Updated
Apr 7, 2026
3
Submission Deadline
Apr 13, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Mission and Installation Contracting Command - Fort Drum (DEPT OF THE ARMY) is seeking Architect-Engineer (A-E) Design Services for the Modernized Pre-Mix and Nitrocellulose (NC) Dehydration Facilities at Radford Army Ammunition Plant (RFAAP). This is an A-E Synopsis, conducted under the Brooks Architect-Engineer Act, and is a Total Small Business Set-Aside. Responses are due by April 13, 2026.

Scope of Work

The objective of this project is to prepare a 30% design for the Nitro Cellulose (NC) Dehydration (including NC Shredding) and Pre-Mix facilities at Radford Army Ammunition Plant (RFAAP). The design must incorporate the most modern, safe, environmentally friendly, and automated technologies to the maximum extent feasible. This procurement emphasizes professional services, with contracts negotiated based on demonstrated competence and qualifications.

Contract & Timeline

  • Type: Architect-Engineer (A-E) Design Services Synopsis
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Response Due: April 13, 2026
  • Published: April 7, 2026

Evaluation

This procurement is conducted under the Brooks Architect-Engineer Act (40 U.S.C Section 1102) and FAR subpart 36.102, which require that A-E contracts be negotiated on the basis of demonstrated competence and qualifications for the required professional services.

Additional Notes

Amendment 0001 to this Synopsis added Attachment 2 - Requests for Information.

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 7, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Mar 12, 2026
View
Version 1
Sources Sought
Posted: Jan 9, 2026
View