TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is soliciting proposals for the replacement of switchgear in Building 1 at Tinker Air Force Base, Oklahoma. This opportunity is restricted to MAC BOA holders who attended the mandatory site visit on May 14, 2026. The project involves replacing existing 280V/208V substations with new 480V/208V switchgears. Proposals are due June 12, 2026.
Scope of Work
The project, titled "WWYK200051 Replace Switchgear, Bldg 1," requires furnishing all materials, labor, tools, transportation, equipment, testing, quality control, and incidentals. This includes replacing the 3000amp 208Volt switchgear in the center of Building 1, which has a 3000amp main and two 600amp feeder breakers. The contractor must perform a site investigation, verify existing conditions, and provide necessary logistical, architectural, and structural work elements to ensure a complete, fully operating system.
Contract Details
- Contract Type: Firm Fixed Price.
- Period of Performance: 180 calendar days from the Notice to Proceed.
- Estimated Magnitude: Between $100,000 and $250,000.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Eligibility: Restricted to Tinker AFB MAC BOA holders who attended the mandatory site visit on May 14, 2026.
- Location: Building 1, Tinker Air Force Base, S Coffeyville, OK.
- Key Requirement: A bid guarantee (20% of bid price or $500,344.09, whichever is less) is required. Performance and Payment Bonds are also required within 10 days of award.
Submission & Evaluation
- Proposals Due: June 12, 2026, by 12:00 PM local time.
- Evaluation: Award will be based on a Lowest Priced Technically Acceptable (LPTA) source selection procedure. Technical evaluation will assess Capability and Management, and Schedule and Planning. Proposals must be technically acceptable and conform to all requirements.
- Submission Format: Email submissions are permitted, following specific guidelines. Proposals must be valid for at least 120 calendar days.
Key Updates & Notes
- Amendment 0001 (May 28, 2026): Incorporated Clause 52.228-1 (Bid Guarantee), updated the solicitation number, and confirmed the proposal due date of June 12, 2026. IFC Specifications and As-Built Information were uploaded.
- Mandatory Site Visit: Attendance at the May 14, 2026, site visit was mandatory for eligibility.
- Technical Issues: Contractors experiencing technical issues accessing IFC Specifications must notify the Contracting Specialist immediately.
- Funding: The Government's obligation is contingent upon the availability of appropriated funds.