TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1

SOL #: FA813726R0025Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Office Buildings (Z2AA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 24, 2026
2
Last Updated
Jun 12, 2026
3
Submission Deadline
Jun 19, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force (FA8137 AFSC PZIOC) is soliciting proposals for the replacement of switchgear in Building 1 at Tinker Air Force Base, Oklahoma. This is a Firm Fixed-Price construction order under an existing Multiple Award Contract (MAC) BOA. The estimated project value is between $100,000 and $250,000. Proposals are due June 19, 2026, at 12:00 PM Central Time.

Scope of Work

This project involves furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals required to replace existing 280V and 208V substations with new 480V and 208V switchgears in Building 1. Specifically, this includes replacing the 3000amp 208Volt switchgear, which has a 3000amp main and two 600amp feeder breakers. The contractor must perform a site investigation, identify logistical, architectural, and structural work elements, and ensure a complete, fully operating system.

Contract Details

  • Contract Type: Firm Fixed-Price Construction Order
  • Period of Performance: 180 calendar days from the Notice to Proceed.
  • Estimated Magnitude: $100,000 - $250,000
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Eligibility: Restricted to current MAC BOA holders who attended the mandatory site visit on May 14, 2026.
  • NAICS Code: 236220 (Size Standard: $45,000,000.00 annual receipts)

Submission & Evaluation

Proposals will be evaluated using Lowest Priced Technically Acceptable (LPTA) source selection procedures. Technical proposals must demonstrate capability and management, and a realistic schedule and planning approach. Price proposals will be evaluated for reasonableness, balance, and realism.

  • Proposal Due Date: June 19, 2026, at 12:00 PM Central Time.
  • Bid Guarantee: Required, minimum 20% of bid price or $500,344.09, whichever is less.
  • Bonds: Performance and Payment Bonds are required within 10 calendar days after award.

Key Requirements & Notes

Contractors must adhere to extensive Tinker AFB general requirements, safety regulations (OSHA, EM 385-1-1, AFI 48-127), and environmental specifications. The facility will remain occupied during construction, requiring coordination. Key personnel (Project Manager, Quality Control Manager, Site Safety and Health Officer, Project Superintendent) must meet specific experience requirements. Electronic documentation, including a baseline schedule, weekly progress reports, record drawings, and O&M manuals, are mandatory. Prevailing wage rates for Oklahoma County, Oklahoma, apply.

People

Points of Contact

Dedrian Parmer JrPRIMARY
Stephen PalmerSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Combined Synopsis/Solicitation
Posted: Jun 12, 2026
View
Version 7Viewing
Combined Synopsis/Solicitation
Posted: Jun 8, 2026
Version 6
Combined Synopsis/Solicitation
Posted: Jun 2, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: May 28, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: May 22, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: May 18, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: May 14, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 24, 2026
View