TINKER AFB MAC BOA WWYK250088 ~ Repair Interior Walls, B8400

SOL #: FA813726R0011Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Office Buildings (Z2AA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 12, 2026
2
Last Updated
Mar 11, 2026
3
Response Deadline
Feb 19, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force has issued a Presolicitation (FA813726-R-0011) for Tinker AFB MAC BOA Holders ONLY to repair interior walls, drywall, and roof decking at Building 8400, Tinker Air Force Base, Oklahoma. This is a Total Small Business Set-Aside. The Request for Proposal (RFP) is currently in draft. A mandatory Initial Site Visit is scheduled for Monday, February 23, 2026, at 10:00 AM Central time. Interested Prime Contractors must RSVP within 5 calendar days of the posting date.

Scope of Work

The project, titled "WWYK250088 – REPAIR INTERIOR WALLS, B8400," requires furnishing all materials, labor, tools, transportation, equipment, testing services, quality control, and incidentals. Key tasks include:

  • Demolishing and removing existing CMU block walls and gypsum partitions.
  • Replacing CMU blocks at pilasters, repointing damaged mortar joints, and repainting.
  • Bracing walls for out-of-plane movement and stitching separated CMU walls.
  • Repairing damaged drywall, including structural backing and new gypsum board installation.
  • Demolishing and reconnecting electrical receptacles and telephone jacks, and installing new receptacles.
  • A site investigation is required to verify existing conditions, with as-built drawings available.

Contract Details

  • Opportunity Type: Presolicitation (RFP in draft stage)
  • Solicitation Number: FA813726-R-0011
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Location: Tinker AFB, Building 8400, S Coffeyville, OK 73145
  • Eligibility: Tinker AFB MAC BOA Holders ONLY.
  • Key Personnel: Requires a Project Manager, Quality Control Manager, Site Safety and Health Officer, and Project Superintendent, each with specific experience. Resumes are due within five (5) calendar days after Notice to Proceed (NTP).
  • Quality Control: Contractor must establish a QC plan, inspection system, and maintain inspection files.
  • Site Access: An Entry Access List (EAL) and Vehicle Entry Access List (VEAL) must be submitted 14 days prior to access.
  • Working Hours: Normal duty hours are 0700-1600 Monday-Friday. The facility will remain occupied during construction.
  • Submittals: A comprehensive Submittal Register is provided and must be reviewed and revised within ten (10) days of NTP.
  • Drawings: Detailed architectural and structural drawings (G-101, S-101, S-102) are attached, critical for understanding the scope and estimating costs.

Key Dates & Actions

  • Published Date: February 12, 2026
  • RSVP for Site Visit: Within 5 calendar days from posting (by February 17, 2026) to the Contracting Points of Contact. Include base access information/EAL if needed. Only Prime Contractors are to RSVP.
  • Mandatory Initial Site Visit: Monday, February 23, 2026, at 10:00 AM Central time. Attendance is required to be eligible to propose. Location instructions are in the attachments.
  • Presolicitation Response Date: February 19, 2026

Contact Information

People

Points of Contact

Dedrian Parmer JrPRIMARY
Stephen PalmerSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 6
Pre-Solicitation
Posted: Mar 11, 2026
View
Version 5
Pre-Solicitation
Posted: Mar 11, 2026
View
Version 4
Pre-Solicitation
Posted: Mar 10, 2026
View
Version 3
Pre-Solicitation
Posted: Feb 25, 2026
View
Version 2
Pre-Solicitation
Posted: Feb 24, 2026
View
Version 1Viewing
Pre-Solicitation
Posted: Feb 12, 2026