TINKER AFB MAC BOA WWYK250173, Replace Bowling Alley Roof, B5703

SOL #: FA813726R0029Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Recreational Buildings (Z2FB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 4, 2026
2
Last Updated
Jun 10, 2026
3
Submission Deadline
Jun 15, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for the replacement of the Bowling Alley Roof (B5703) at Tinker Air Force Base, Oklahoma. This is a Total Small Business Set-Aside opportunity, exclusively for Tinker AFB MAC BOA Holders. The project involves comprehensive design-build services for the roof replacement. Proposals are due June 15, 2026.

Scope of Work

This project, identified as WWYK250173, requires furnishing all design/engineering services, materials, labor, and equipment for the repair and replacement of the roof on Building 5703. Key aspects include:

  • Full design-build engineering services are required, encompassing structural calculations, wind uplift, thermal performance, and code compliance.
  • Performing a site investigation to verify existing conditions and identify logistical, architectural, and structural elements.
  • Demolition of the 1979 retrofit roof system, while the original metal roof structure is to remain below certain sections.
  • Installation of new metal roofing for Sections 2 and 3, and a new EPDM roof for Section 1, including flashing, gutters, downspouts, and mechanical curbs.
  • Addressing environmental concerns, as studies have confirmed the presence of asbestos-containing materials (ACM) and lead-based paint (LBP) in various building materials.
  • Compliance with quality control, health and safety programs (EM 385-1-1), and specific submittal requirements outlined in the Submittal Register.
  • The facility will remain occupied during construction, requiring coordination for access and material storage.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation (implied Firm Fixed Price)
  • Estimated Magnitude: Between $1,000,000 and $5,000,000
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5), 100% for SB MAC BOA holders only.
  • NAICS Code: 236220 (Commercial and Institutional Building Construction)
  • Size Standard: $45,000,000 Annual receipts
  • Period of Performance: 447 calendar days after Notice to Proceed (NTP).
  • Funding: Contingent upon the availability of appropriated funds.
  • Bonds: Performance and payment bonds are required.

Key Dates & Actions

  • Mandatory Site Visit: May 20, 2026 (attendance was required for eligibility).
  • RFIs Due: May 28, 2026 (responses are binding and part of construction documents).
  • Proposals Due: June 15, 2026, by 2:00 PM local time.

Evaluation

Award will be based on Lowest Priced Technically Acceptable (LPTA) source selection procedures. Technical proposals will be evaluated against specific subfactors, with the award going to the lowest evaluated priced proposal meeting acceptability standards and conforming to solicitation requirements.

Additional Notes

Bidders must have attended the mandatory site visit on May 20, 2026, to be eligible. Personnel requiring base access must submit an Entry Access List (EAL). Wage rates are subject to the Davis-Bacon Act for Oklahoma County.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6Viewing
Combined Synopsis/Solicitation
Posted: Jun 10, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Jun 9, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Jun 9, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Jun 8, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: May 20, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: May 4, 2026
View
TINKER AFB MAC BOA WWYK250173, Replace Bowling Alley Roof, B5703 | GovScope