TINKER AFB MAC BOA WWYK260003 REPAIR ROOF, ELECT, HVAC & RESTROOMS B#4019
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is soliciting proposals for the WWYK260003 REPAIR ROOF, ELECT, HVAC & RESTROOMS project at Building B4019, Tinker Air Force Base, Oklahoma. This opportunity is a 100% Total Small Business Set-Aside and is exclusively open to Tinker AFB MAC BOA Holders who attended the mandatory site visit on May 20, 2026. The estimated project value is between $1,000,000 and $5,000,000. Proposals are due by June 17, 2026.
Scope of Work
This project involves the comprehensive renovation of Building B4019 for office use. The contractor will be responsible for furnishing all design/engineering services, materials, labor, and equipment necessary to repair and upgrade the roof, electrical systems, HVAC, and restrooms. Key responsibilities include:
- Full Design Responsibility: The contractor is fully responsible for all design, engineering, site investigations, and ensuring the final product meets all applicable codes and functional requirements. Government-provided drawings are for reference only.
- Site Investigation: Verify existing conditions and obtain additional as-built drawings if needed.
- Logistical & Architectural Elements: Identify and provide all necessary logistical, architectural, and structural work elements.
- Roof Repair: Includes leak inspection, patching with matching material, and underside insulation/liner replacement as per drawing notes. No asbestos or lead-based paint is present in the existing roof or related components.
- Site Work: All site work, including parking lot restriping, sidewalk, and trench drain, is included in the lump-sum price.
- Record Drawings: Final as-built/record drawings must be submitted in native, fully editable AutoCAD (.dwg) format.
Eligibility & Restrictions
- Mandatory Site Visit: Only MAC BOA Holder General Contractors who attended the Initial Site Visit on May 20, 2026, are eligible to propose.
- Set-Aside: This is a 100% Total Small Business Set-Aside.
- NAICS Code: 236220 (Commercial and Institutional Building Construction) with a size standard of $45,000,000 annual receipts.
Contract Details
- Contract Type: Firm Fixed Price.
- Period of Performance: Work must begin within 10 calendar days after Notice to Proceed and be completed within 265 calendar days.
- Bonds: Performance and Payment Bonds are required.
- Place of Performance: Tinker Air Force Base, Oklahoma.
Submission & Evaluation
- Proposal Due Date: June 17, 2026, by 02:00 PM local time.
- Evaluation: Proposals will be evaluated using a Lowest Priced Technically Acceptable (LPTA) source selection procedure, considering technical acceptability and price.
- Offer Validity: Offers must remain valid for at least 120 calendar days.
- RFIs: Pre-bid RFI answers have been provided, clarifying key aspects of the project.
Key Documents & Contacts
- Statement of Work (SOW): Details project requirements, performance standards, and key personnel.
- Drawings: Architectural drawings are available for scope understanding.
- Submittal Register: Outlines all required contractor submittals.
- Wage Determination: Applicable wage rates for Oklahoma County are provided.
- Base Access: An 'EAL List' spreadsheet is provided for personnel requiring base access.
- Primary Contact: Mario Tedeschi (mario_cassiel.tedeschi@us.af.mil, 312-884-4701).
- Secondary Contact: Tamra Torres (Tamra.torres@us.af.mil, 405-339-3513).