Tinker AFB MACBOA WWYK250172 Replace Walls of Iszard Pool

SOL #: FA813726R0016Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Repair Or Alteration Of Recreational Buildings (Z2FB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 12, 2026
2
Last Updated
Jun 12, 2026
3
Submission Deadline
Jun 15, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for the WWYK250172 – Replace Walls of Iszard Pool House project at Tinker Air Force Base, Oklahoma. This project involves comprehensive repair and alteration of the pool house structure. The estimated value is between $500,000 and $1,000,000. This opportunity is a Total Small Business Set-Aside and is restricted to Tinker AFB MAC BOA Holders ONLY. Proposals are due June 15, 2026, at 03:00 PM local time.

Scope of Work

The project, identified as Solicitation Number FA813726R0016, requires furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals. Key tasks include:

  • Replacement of CMU fence walls, roof, and electrical systems & components.
  • Repair of the existing pool house structure at Building B5730.
  • Demolition of existing masonry, wood privacy fences, utility gates, and specific CMU wall sections.
  • Installation of new 8-foot-tall metal panel fences, utility gates, concrete sidewalks, and repairs to existing walls.
  • Demolition of the existing built-up roof system and installation of a new PVC roof system, including insulation, flashing, gutters, and downspouts.
  • Demolition of existing electrical components and installation of new electrical systems, including panelboards, receptacles, and lighting fixtures.
  • Performing a site investigation to verify existing conditions.
  • Identifying and providing all necessary logistical, architectural, and structural work elements for a complete, fully operating system.

Contract Details & Requirements

  • Contract Type: Firm Fixed Price.
  • Estimated Value: $500,000 - $1,000,000.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Eligibility: Restricted to Tinker AFB MAC BOA Holders ONLY. Offerors must have attended the initial site visit held on March 25, 2026, to be considered eligible.
  • Period of Performance: Begin within 10 calendar days after Notice to Proceed (NTP) and complete within 180 calendar days.
  • Bonds: Performance and Payment Bonds are required within 10 calendar days after award.
  • Funds: Funds are not presently available; obligation is contingent upon appropriated funds.
  • Wage Determination: Bidders must adhere to the General Decision Number OK20260049 (effective 01/23/2026) for prevailing wage rates and fringe benefits for building construction in Oklahoma County, Oklahoma.

Submission & Evaluation

  • Proposal Due Date: June 15, 2026, at 03:00 PM local time.
  • Offer Validity: Offers must be valid for at least 120 calendar days.
  • Evaluation Factors: Instructions to Offerors and Evaluation Factors for Award are detailed in Sections L and M of the solicitation.

Special Requirements & Clarifications

  • Personnel: Key personnel (Project Manager, Quality Control Manager, Site Safety and Health Officer, Project Superintendent) must possess current licenses/certifications, with alternates designated. AFMC Form 387 contractor badges are required.
  • Documentation: Electronic submission of documents (PDF, DWG) with strict naming conventions. A baseline construction schedule is due within 10 days of NTP.
  • Submittals: A comprehensive Submittal Register outlines all required documentation, including plans, certifications, and reports. Anticipated turnaround time for submittals is approximately 10 working days.
  • Design: The project is to be constructed based on unsigned and sealed 35% design drawings; no working documents are required.
  • Utilities: Contractors are responsible for identifying and protecting all active utilities; hydro-excavation is preferred where feasible.
  • Environmental: Asbestos-containing materials (ACM) have been identified in roofing sealant materials.

Contact Information

For inquiries, contact Tamra Torres (Tamra.torres@us.af.mil) or Nicholas Appleby (nicholas.appleby@us.af.mil).

People

Points of Contact

Tamra TorresPRIMARY
Nicholas ApplebySECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Solicitation
Posted: Jun 12, 2026
View
Version 5
Solicitation
Posted: Jun 11, 2026
View
Version 4Viewing
Solicitation
Posted: May 27, 2026
Version 3
Solicitation
Posted: May 11, 2026
View
Version 2
Solicitation
Posted: Apr 27, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 12, 2026
View