TUBE SEAMLESS NICKEL COPPER ALLOY

SOL #: N0010426Q19764Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
PORTSMOUTH NAVAL SHIPYARD GF
PORTSMOUTH, NH, 03801-5000, United States

Place of Performance

Kittery, ME

NAICS

Iron and Steel Pipe and Tube Manufacturing from Purchased Steel (331210)

PSC

Pipe, Tube And Rigid Tubing (4710)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 6, 2026
2
Last Updated
May 22, 2026
3
Submission Deadline
May 22, 2026, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, specifically the Portsmouth Naval Shipyard, is soliciting quotations (RFQ N0010426Q19764) for the procurement of Seamless Nickel Copper Alloy Tubing. This opportunity is a Total Small Business Set-Aside. Quotes are due by May 22, 2026, at 10:00 AM ET.

Scope of Work

This Request for Quotation (RFQ) seeks proposals for:

  • Item 0001: 1,638 Linear Feet of TUBE SEAMLESS MIL-T-23520 NICKEL COPPER ALLOY, MIL-T-23520A, 1.315OD (NSN: 4710-00-455-0197 X2). Freight costs must be included in the price.
  • Item 0002: Associated Data Requirements for Item 0001, which are Not Separately Priced (NSP). The tubing must conform to detailed specifications outlined in attachments, including MIL-DTL-23520E, and undergo specific Non-Destructive Testing (NDT) procedures (Ultrasonic and Liquid Penetrant per MIL-STD-2132D). Quality assurance must comply with MIL-I-45208 or ISO 9001/9002/9003. Calibration systems must meet OPNAVINST 3960.16, NAVSEAINST 4734.1, ANSI/NCSL Z540.3, or ISO/IEC 17025:2017 standards.

Contract & Timeline

  • Contract Type: Request for Quotation (RFQ)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Place of Performance: Portsmouth Naval Shipyard, Kittery, ME 03904
  • Required Delivery: 50 Weeks After Receipt of Order (ARO)
  • Quote Due Date: May 22, 2026, 10:00 AM ET
  • Published Date: May 19, 2026
  • Contact: Dayna O'Brien (dayna.k.obrien.civ@us.navy.mil, 207-690-1687)

Submission & Evaluation

Offers must be emailed to Dayna.k.obrien.civ@us.navy.mil by the due date. Award will be made on an "All or None" basis, and CPARS evaluation procedures apply. The evaluation will follow a Lowest Price Technically Acceptable (LPTA) approach, considering:

  • Technical Capability: Requires submission of applicable NDT procedures and evidence of quality compliance. Offerors must provide a signed statement certifying items meet specifications.
  • Delivery Schedule: Must meet the 50 weeks ARO requirement.
  • Price: Delivered prices, availability, price source, and price breakdowns are required.
  • Past Performance: Offerors must provide at least three relevant projects from the last five years. Vendors must be registered in the System for Award Management (SAM).

Key Attachments

Bidders should review critical attachments including the Technical Ordering Data (TOD), Individual Repair Part Ordering Data (IRPOD), Exhibit A (Contract Data Requirements List - CDRL for material certifications and procedure approvals), and Operations Security (OPSEC) requirements. These documents detail technical specifications, quality control, documentation, and security protocols.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Solicitation
Posted: May 22, 2026
View
Version 5Viewing
Solicitation
Posted: May 19, 2026
Version 4
Solicitation
Posted: May 11, 2026
View
Version 3
Solicitation
Posted: Apr 27, 2026
View
Version 2
Pre-Solicitation
Posted: Apr 7, 2026
View
Version 1
Pre-Solicitation
Posted: Apr 6, 2026
View