UNICOR ROOF AND HVAC REPLACEMENT - LEXINGTON

SOL #: SV0204-26Combined Synopsis/Solicitation

Overview

Buyer

Justice
Federal Prison Industries, Inc
FEDERAL PRISON INDUSTRIES, INC
LEXINGTON, KY, 40511, United States

Place of Performance

Lexington, KY

NAICS

Roofing Contractors (238160)

PSC

Repair Or Alteration Of Penal Facilities (Z2FF)

Set Aside

8(a) Set-Aside (FAR 19.8) (8A)

Timeline

1
Posted
Mar 6, 2026
2
Last Updated
Apr 27, 2026
3
Submission Deadline
Apr 28, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Prison Industries (UNICOR), operating within FMC Lexington, KY, is soliciting proposals for a Firm Fixed-Price Construction Type Contract for Roof and HVAC Replacement. This project is a competitive 8(a) Set-Aside for participants within the Kentucky servicing district. The proposal deadline is April 28, 2026, at 2:00 PM EST.

Scope of Work

This project involves the replacement of approximately 66,000 square feet of existing ballasted EPDM roofing with a new adhered TPO roofing system. The scope includes removing skylights, filling the roof deck, and installing a non-penetrating ballasted fall protection railing system in designated areas. Masonry re-pointing and concrete repairs will be performed on deteriorated walls and the upper balcony edge. The existing rooftop HVAC systems and controls will be replaced with new systems, including new ductwork. Note: One Roof Top Unit (RTU) with associated ductwork has been removed from the project scope per Amendment 00001. Additional tasks include asbestos abatement and mold remediation. The project must be completed within 265 days after receiving the notice to proceed.

Contract & Timeline

  • Contract Type: Firm Fixed-Price Construction
  • Estimated Value: Between $5,000,000.00 and $10,000,000.00
  • Set-Aside: Competitive 8(a) Business Development (BD) Program (Kentucky servicing district)
  • Mandatory Site Visit: Conducted on March 24, 2026. (Attendance was required for award).
  • Questions Due: March 31, 2026, at 2:00 PM EST (Responses provided in Amendment 00002).
  • Proposal Due: April 28, 2026, at 2:00 PM EST.
  • Period of Performance: 265 calendar days from Notice to Proceed.
  • Published Date: April 24, 2026 (latest amendment).

Evaluation

Proposals will be evaluated based on technical capability, past performance, schedule, and cost. Technical capability, past performance, and schedule are significantly more important than cost. Offerors must hold prices firm for 90 calendar days.

Additional Notes

A mandatory site visit was conducted on March 24, 2026; attendance was required for award. Firms must submit Criminal History Check forms for attendees by March 17, 2026, for facility access. A Bid Bond is required for offers over $150,000, with Performance and Payment Bonds required upon award if the contract price exceeds $150,000. Amendment 00003 incorporates FAR 52.222-90, Addressing DEI Discrimination by Federal Contractors (APR 2026). Bidders must comply with the prevailing wage rates and fringe benefits outlined in the Davis-Bacon Act wage determination (GDN KY20260090) for Fayette County, KY.

People

Points of Contact

Jason MorganPRIMARY
Joshua HasslerSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Apr 24, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Apr 13, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 7, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 6, 2026
View