UPS battery backup
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Department of Agriculture (USDA), specifically the Animal and Plant Health Inspection Service (APHIS), is soliciting quotes for the installation of a UPS battery backup system for a server in Fort Collins, CO. This is a Total Small Business Set-Aside (FAR 19.5). Quotes are due by March 11, 2026, at 11 a.m. MT.
Scope of Work
The project involves adding a UPS system to a server, including the installation of a 25kW UPS unit on one of the current 60-amp circuits for the main server rack. Required equipment includes a Galaxy VS UPS 25kW 208V with internal battery strings (expandable), a Galaxy VS Maintenance Bypass cabinet (or equal), and an Emergency Power Off (EPO) button. The battery runtime requirement is less than 5 minutes, primarily to bridge the gap until a generator activates (expected within 30 seconds). All materials must be on-site for a single-day installation, with work hours from 7 am to 4 pm on weekdays. Contractor personnel must possess a valid driver's license.
Key Clarifications & Technical Details
An external wall mount maintenance bypass is acceptable, and a full cabinet is not required. The government does not have electrical one-line drawings. The current server rack load is approximately 30kW, and bidders are requested to provide quotes for both 20kVA and 30kVA UPS units. No specific location for the EPO installation has been designated, allowing for the best fit and least expensive option. The bypass maintenance switch does not require a separate cabinet; a panel with similar features is acceptable for specified configurations. The existing electrical panel is a Siemens P1, 208Y/120 3P 4W, 250 Amps Max, with specific compatible breaker types and a minimum cabinet size of 20" W x 5.75" DP x 38" H.
Contract & Timeline
This is a Request for Quotations (RFQ) with an estimated magnitude between $25,000 and $100,000. The anticipated contract type is not specified, but award will be made on Standard Form 1442. Completion is required no later than 90 days after the Notice to Proceed, and a payment bond will be required within 10 days of award. Federal Construction Wage Rates for Larimer County, Colorado (General Decision Number CO20260024, effective 01/02/2026) apply. The USDA is exempt from sales tax.
Submission & Evaluation
Quotes must be submitted to james.g.roloff@usda.gov by March 11, 2026, at 11 a.m. MT. Complete quote packages must include the quote page, demonstration of relevant experience, and past performance information. Award will be made on a Lowest Price, Technically Acceptable basis, evaluating Price, Technical Capability (relevant experience with similar electrical equipment), and Past Performance.
Contact Information
For inquiries, contact Jim Roloff at james.g.roloff@usda.gov or 612-590-7603.