USACE SPK DBB Construction - Englebright Dam and Lake HQ Building and Maintenance Shop ?Smartsville, California.

SOL #: W9123826BA008Solicitation

Overview

Buyer

SACRAMENTO, CA, 95814-2922, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 10, 2025
2
Last Updated
Mar 2, 2026
3
Submission Deadline
Feb 2, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE) Sacramento District (SPK) issued a Total Small Business Set-Aside solicitation for Design-Bid-Build (DBB) construction services to build a new Headquarters (HQ) building and maintenance shop at H.L. Englebright Dam and Lake in Smartsville, CA. The solicitation has closed, and an Abstract of Offers has been issued, detailing bids received from contractors.

Project Scope

This project involves the construction of a new 5,000 SF single-story HQ building (metal-stud construction) and a new 4,200 SF single-story maintenance shop with a storage mezzanine (pre-engineered metal building). The scope also includes new pre-engineered metal buildings for equipment and hazardous material sheds, demolition of existing structures, grading, utilities, oxidation pond relining, paving, sidewalks, curbs, fencing, and landscaping. The estimated construction magnitude is between $10,000,000.00 and $25,000,000.00.

Contract Details

  • Contract Type: Firm-Fixed-Price
  • Set-Aside: Total Small Business (FAR 19.5)
  • NAICS: 236220, Commercial and Institutional Building Construction ($45 million size standard)
  • PSC: Y1JZ, Construction of Miscellaneous Buildings
  • Estimated Duration: 720 calendar days from Notice to Proceed (NTP)
  • Estimated Award: Approximately March 2026

Solicitation Status & Offers Received

The solicitation (W9123826BA008) closed on February 27, 2026, at 10:00 am PST. An Abstract of Offers (OF-1419 and OF-1419A) was issued on March 2, 2026, detailing offers received from contractors including KOMAN INTEGRATED SOLUTION, LEAD BUILDERS INC., and R2BUILD. These documents provide a breakdown of unit prices and estimated amounts for various construction items, confirming acknowledgment of amendments and bid security.

Key Requirements for Bidders (Past Tense)

Bidders were required to be registered in the PIEE system to submit bids and in SAM.gov before the closing date. The project is subject to the E-Verify program, sustainable acquisition requirements, and may be subject to WTO Government Procurement Agreement and Free Trade Agreements.

Amendments

The solicitation underwent several amendments, including Amendment 0005, Amendment 0004 (extending the bid due date to Feb 27, 2026), Amendment 0003 (extending to Feb 19, 2026), and Amendment 0002 (extending to Feb 16, 2026). Amendment 0001 included site visit sign-in sheets and updated wage determinations.

Contact Information

For inquiries, contact Antonina Beal at antonina.beal@usace.army.mil or 916-557-7543, or Rachel L. Kinney at Rachel.Kinney@usace.army.mil or 916-717-7532.

People

Points of Contact

Files

Files

View
View
View
View
View
View
View
View

Versions

Version 9
Solicitation
Posted: Mar 2, 2026
View
Version 8
Solicitation
Posted: Feb 13, 2026
View
Version 7
Solicitation
Posted: Feb 11, 2026
View
Version 6
Solicitation
Posted: Feb 10, 2026
View
Version 5
Solicitation
Posted: Jan 30, 2026
View
Version 4
Solicitation
Posted: Jan 13, 2026
View
Version 3
Solicitation
Posted: Dec 31, 2025
View
Version 2Viewing
Solicitation
Posted: Dec 31, 2025
Version 1
Pre-Solicitation
Posted: Dec 10, 2025
View