USACE SPK DBB Construction - Englebright Dam and Lake HQ Building and Maintenance Shop ?Smartsville, California.

SOL #: W9123826BA008Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W075 ENDIST SACRAMENTO
SACRAMENTO, CA, 95814-2922, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 10, 2025
2
Last Updated
Mar 2, 2026
3
Submission Deadline
Feb 27, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The United States Army Corps of Engineers (USACE) Sacramento District (SPK) is soliciting bids for Design-Bid-Build (DBB) construction services to build a new Headquarters (HQ) building and a maintenance shop at H.L. Englebright Dam and Lake in Smartsville, California. This is a Total Small Business Set-Aside opportunity. Bids are due by February 27, 2026, at 10:00 am PST.

Scope of Work

The project involves the construction of a new single-story, 5,000 square-foot (SF) HQ building and a new single-story, 4,200 SF maintenance shop with a storage mezzanine. The HQ building will feature management offices, open cubicle areas, a conference room, information center, and support facilities. The maintenance shop will be a pre-engineered metal building with maintenance bays, offices, a locker room, and a storage mezzanine, along with new equipment and hazardous material sheds. The scope also includes the demolition and removal of two existing buildings and three shed structures, new building construction, grading, utilities, oxidation pond relining, asphaltic concrete paving, sidewalks, curbs, fencing, and landscaping.

Contract & Timeline

  • Contract Type: Firm-Fixed-Price
  • Estimated Magnitude: Between $10,000,000.00 and $25,000,000.00
  • Duration: 720 calendar days from Notice to Proceed (NTP)
  • Anticipated Award: Approximately March 2026
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 236220, Commercial and Institutional Building Construction (Size Standard: $45 million annual revenue)
  • Product Service Code: Y1JZ, Construction of Miscellaneous Buildings
  • Bid Due Date: February 27, 2026, no later than 10:00 am PST
  • Published Date: February 13, 2026

Key Requirements & Actions

  • Site Visit: A site visit was conducted, and the sign-in sheet is posted. (Originally anticipated mid-January 2026).
  • Registration: Offerors must be registered in the PIEE system at least one week prior to the bid due date to submit a bid. Registration in SAM.gov is also required before the solicitation closing date.
  • Compliance: The project is subject to the E-Verify Employment Eligibility Verification Program, sustainable acquisition requirements, and high-performance sustainable building design and construction practices. It is also subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements.
  • Monitoring: Offerors must monitor PIEE and SAM.gov for all solicitation updates and amendments. USACE will not provide direct notifications.

Contact Information

People

Points of Contact

Files

Files

View
View
View
View
View
View
View
View

Versions

Version 9
Solicitation
Posted: Mar 2, 2026
View
Version 8Viewing
Solicitation
Posted: Feb 13, 2026
Version 7
Solicitation
Posted: Feb 11, 2026
View
Version 6
Solicitation
Posted: Feb 10, 2026
View
Version 5
Solicitation
Posted: Jan 30, 2026
View
Version 4
Solicitation
Posted: Jan 13, 2026
View
Version 3
Solicitation
Posted: Dec 31, 2025
View
Version 2
Solicitation
Posted: Dec 31, 2025
View
Version 1
Pre-Solicitation
Posted: Dec 10, 2025
View