USACE SPK Hill Air Force Base Plating Shop Renovation SATOC
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers, Sacramento District (USACE SPK), is soliciting proposals for a Single Award Task Order Contract (SATOC) for the renovation, modernization, and phased replacement of plating shop facilities at Hill Air Force Base (HAFB), Utah. This is an unrestricted (full and open) competition for a Design-Bid-Build (DBB) contract. Proposals are due June 11, 2026.
Scope of Work
This SATOC will support design-bid-build construction task orders for the renovation of existing plating shop facilities (Building 505) and the new construction of a 2,800 sqft Pre-Engineered Metal Building (PEMB) to house relocated ovens. The work involves highly specialized industrial construction within an active operational environment. Key tasks include:
- Demolition and replacement of existing plating line tanks and process equipment.
- Installation of new electroplating, anodizing, cleaning, stripping, and surface treatment process lines.
- Installation of chemical distribution and storage systems.
- Upgrades to mechanical, electrical, control, ventilation, air quality, fire suppression, and life safety systems.
- Structural modifications to support new process equipment and utility upgrades.
- Phased construction to ensure continuous mission operations and compliance with environmental, safety, and regulatory requirements.
Contract Details
- Contract Type: Single Award Task Order Contract (SATOC), Firm Fixed Price task orders.
- Set-Aside: Unrestricted (Full and Open Competition). Small business subcontracting goals apply: SB 23%, SDB 5%, WOSB 5%, HUBZone 3%, SDVOSB 3%.
- Estimated Value: Total SATOC capacity is approximately $134,000,000 over a five-year ordering period. Individual task orders are anticipated to range from $2,500 to $40 million, with a maximum value not to exceed approximately $50,000,000 per task order. The magnitude of construction is estimated between $100,000,000 and $250,000,000.
- Period of Performance: 1,825 calendar days (five years) ordering period from contract award.
- Bonding: Performance and payment bonds will be required at the individual task order level.
Submission & Evaluation
Proposals must be submitted electronically through the PIEE website. Award will be based on a Best Value Tradeoff (BVTO) process in accordance with FAR Part 15. Evaluation factors, in order of importance, include:
- Past Performance: Relevancy scale (e.g., Highly Relevant: >= $25M, multi-trade integration in operational industrial facility).
- Technical and Management Approach.
- Network Analysis Schedule (NAS).
- Small Business Participation Commitment Document. Price will be evaluated for completeness, reasonableness, and balance.
Key Dates & Contacts
- ProjNet Closes: May 16, 2026
- Proposals Due: June 11, 2026
- Anticipated Award: August 11, 2026
- Primary Contact: Melita Doyle, melita.s.doyle@usace.army.mil, 916-557-6611.
- A pre-proposal conference and site visit were held on May 1, 2026. All questions must be submitted through ProjNet.