USACE SPK Hill Air Force Base Plating Shop Renovation SATOC
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers, Sacramento District (USACE SPK) is soliciting proposals for a Single Award Task Order Contract (SATOC) for the renovation, modernization, and phased replacement of plating shop facilities at Hill Air Force Base (HAFB), Utah. This is a Full and Open Competition with a total estimated capacity of $134,000,000. Proposals are due June 11, 2026.
Scope of Work
This Design-Bid-Build (DBB) SATOC will support construction task orders for the renovation and modernization of plating shop facilities, specifically Buildings 505 and 507, and associated infrastructure at HAFB. Key work includes:
- Demolition and replacement of existing plating line tanks and process equipment.
- Installation and commissioning of new electroplating, anodizing, cleaning, stripping, and surface treatment process lines.
- Installation of chemical distribution and storage systems.
- Upgrades to mechanical, electrical, control, ventilation, air quality, environmental control, fire suppression, and life safety systems.
- Structural modifications to support new process equipment.
- Construction of a new approximately 2,800-square-foot Pre-Engineered Metal Building (PEMB) to house relocated ovens.
- Utility upgrades, including process piping, compressed air, gases, power distribution, and controls. The project requires phased construction to ensure continuous mission operations and compliance with environmental, safety, and regulatory requirements. Work involves highly specialized industrial construction within an active operational environment.
Contract Details
- Contract Type: Single Award Task Order Contract (SATOC), Firm-Fixed-Price task orders.
- Ordering Period: Five (5) years (1,825 calendar days).
- Total Capacity: Approximately $134,000,000.
- Magnitude of Construction: Estimated between $100,000,000 and $250,000,000.
- Task Order Values: Expected to range from $2,500 to $40 million, with individual task orders not to exceed approximately $50,000,000.
- Bonding: Performance and payment bonds will be required at the individual task order level.
Set-Aside & Small Business
This acquisition is conducted under Full and Open Competition (Unrestricted). The Government strongly encourages small business participation as subcontractors and suppliers, with specific goals: Small Business (SB) 23%, Small Disadvantaged Business (SDB) 5%, Women-Owned Small Business (WOSB) 5%, HUBZone 3%, and Service-Disabled Veteran-Owned Small Business (SDVOSB) 3%.
Evaluation Factors
Award will be based on Best Value Tradeoff procedures (FAR Part 15). Anticipated evaluation factors, in order of importance, include:
- Past Performance: Relevancy based on contract value and scope (Highly Relevant: >= $25M; Relevant: $10M-$25M).
- Technical and Management Approach.
- Network Analysis Schedule (NAS).
- Small Business Participation Commitment Document. Price will be evaluated for completeness, reasonableness, and balance.
Key Dates & Actions
- Proposals Due: June 11, 2026, 8:00 PM ET.
- Anticipated Award Date: August 2026.
- A pre-proposal conference and site visit were held on May 1, 2026.
- Questions via ProjNet closed May 16, 2026.
- Proposals must be submitted electronically through the PIEE website.
Contact Information
- Primary: Melita Doyle (melita.s.doyle@usace.army.mil, 916-557-6611)
- Secondary: Amelia K. Bryant (amelia.k.bryant@usace.army.mil)