USCG Base Portsmouth C5 Trane Chiller Electronic Expansion Valve Replacement

SOL #: 70Z027RFQ260000382Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
BASE PORTSMOUTH(00027)
PORTSMOUTH, VA, 23704, United States

Place of Performance

Portsmouth, VA

NAICS

Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance (811310)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment (J045)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 23, 2026
2
Last Updated
May 20, 2026
3
Submission Deadline
May 27, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard Base Portsmouth is soliciting proposals for the replacement of an Electronic Expansion Valve (EEV) in a Trane Chiller Model # RTAC-1704-UR0N-UAFN-N1TY1DDN, Serial# U09L05904, located at 4000 Coast Guard Blvd, Portsmouth, VA 23703. This requirement is for all labor, materials, and equipment necessary for the replacement. Proposals are due May 27, 2026, at 12:00 PM Eastern Time.

Scope of Work

The work involves replacing the Electronic Expansion Valve (EEV) on circuit one of the specified Trane Chiller. Key tasks include:

  • Valve Removal: Electrically isolating the chiller, recovering refrigerant, and removing the faulty EEV and its controller.
  • Valve Installation: Furnishing and installing a new manufacturer-specified EEV and controller as a matched set. This includes evacuating the circuit to a minimum of 500 microns, performing a decay test, recharging with recovered refrigerant (topping off if needed), re-energizing the unit, and conducting a thorough leak check. The period of performance is not to exceed 30 working days after contract award.

Contract & Timeline

  • Contract Type: Solicitation (RFQ)
  • Set-Aside: None (The Total Small Business Set-Aside was dissolved by Amendment 0002).
  • Response Due: May 27, 2026, at 12:00 PM Eastern Time.
  • Published Date: May 20, 2026 (Amendment 0002).
  • Product Service Code: J045 (Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment).

Key Requirements & Compliance

Offerors must comply with various Federal Acquisition Regulation (FAR) clauses, including:

  • System for Award Management (SAM): Active registration and maintenance of Unique Entity Identifiers (UEI) and Commercial and Government Entity (CAGE) codes are mandatory.
  • Buy American Act: Preference for domestic end products.
  • Sustainable Products: Provision of sustainable products as identified in the SOW.
  • Clean Air Act: Compliance regarding refrigeration equipment.
  • DEI Discrimination: Adherence to FAR 52.222-90 regarding Diversity, Equity, and Inclusion.
  • Personnel: Project Manager availability, Base Access for employees, and compliance with Government regulations.
  • Safety & Environmental: Abidance by OSHA and EPA regulations, including written safety and environmental programs.
  • TRANE Certification: The requirement for quoters to be certified and licensed to work on TRANE products has been removed by Amendment 0001.

Site Visit & Submission Details

Potential quoters were strongly encouraged to visit the site for field verification. Two site visits were held on April 29, 2026. Interested parties were required to arrange visits with Nate Chappell (nathan.c.chappell@uscg.mil). Offers will be evaluated based on Technical Capability and Price, with award made to the lowest priced technically acceptable (LPTA) quote. Invoices will be submitted through the Invoice Processing Platform (IPP).

Contact Information

Primary Point of Contact: Frank Burton (frank.r.burton@uscg.mil).

People

Points of Contact

Frank BurtonPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: May 20, 2026
Version 2
Solicitation
Posted: May 11, 2026
View
Version 1
Solicitation
Posted: Apr 23, 2026
View
USCG Base Portsmouth C5 Trane Chiller Electronic Expansion Valve Replacement | GovScope