USCG Station Portsmouth & Sector Viginia Logistics Building Bathroom Renovations
SOL #: 31040Q260000223Solicitation
Overview
Buyer
Homeland Security
Us Coast Guard
BASE PORTSMOUTH(00027)
PORTSMOUTH, VA, 23704, United States
Place of Performance
Portsmouth, VA
NAICS
Water and Sewer Line and Related Structures Construction (237110)
PSC
Repair Or Alteration Of Office Buildings (Z2AA)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Jan 21, 2026
2
Last Updated
Feb 9, 2026
3
Submission Deadline
Feb 6, 2026, 5:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Coast Guard (USCG) Base Portsmouth is soliciting proposals for Bathroom Renovations at USCG Station Portsmouth and USCG Sector Virginia Logistics Building in Portsmouth, VA. This requirement is a Total Small Business Set-Aside for a Firm Fixed-Price contract. The project involves comprehensive tile and grout restoration, along with a significant renovation of the men's shower area in the Sector Virginia Logistics Building. Proposals are due by February 12, 2026, at 12:00 PM EST.
Scope of Work
The work consists of providing all labor, equipment, and materials for:
- Bathroom Tile and Grout Restoration: Cleaning, repairing, and re-sealing approximately 890 square feet of wall and floor tile and grout surfaces across four bathrooms. This includes removing stains, dirt, contaminants, repairing damaged grout or tiles, and applying a high-quality sealant.
- Men's Shower Renovation (USCG Sector Virginia Logistics Building): A complete renovation to divide the existing single shower into two separate shower stalls. This includes constructing new walls, installing new fixtures (showerheads, mixing valves, drains), exhaust vents with lights, shower pans, curbs, and tiling. A dedicated changing area immediately preceding the shower entrances must also be constructed.
- General Requirements: Compliance with OSHA and EPA regulations, background checks for personnel, and adherence to prevailing wage rates (Davis-Bacon Act).
Contract Details
- Contract Type: Firm Fixed-Price
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z2AA - Repair Or Alteration Of Office Buildings
- NAICS: 237110 - Water and Sewer Line and Related Structures Construction
- Evaluation: Lowest Price Technically Acceptable (LPTA)
- Performance Period: To begin within 5 calendar days after award and complete within 45 calendar days after receiving notice to proceed. The overall project duration is not to exceed 60 working days after contract award.
- Bonds: Performance and Payment Bonds are required.
- Price Hold: Offerors must agree to hold prices firm for 60 calendar days.
- Proposal Acceptance: Government requires 45 calendar days for proposal acceptance.
Submission Requirements
- Proposal Due Date: February 12, 2026, at 12:00 PM EST.
- Submission: Submit the completed SF-1442 (revised version required) and your proposal to Keasha.M.Colvin@uscg.mil. The attached SF30 must be signed acknowledging modifications.
- Site Visit: A site visit is recommended to conduct field verifications. Interested parties should make arrangements with the QAE as stated in the Statement of Work.
- Registration: Offerors must maintain an active registration in the System for Award Management (SAM) at sam.gov, including a Unique Entity Identifier (UEI), Taxpayer Identification Number (TIN), and Commercial and Government Entity (CAGE) code.
Key Amendments
- Amendment 0003 (Feb 9, 2026): Extended the solicitation submission deadline to February 12, 2026, at 12:00 PM EST and provided answers to submitted questions. Clarified that a site visit is recommended but not required, and confirmed a 45-day proposal acceptance period.
- Amendment 0002 (Feb 4, 2026): Extended the submission deadline to February 11, 2026, and required a revised SF1442 form for all submissions.
- Amendment 0001 (Jan 23, 2026): Provided a revised Request for Quotation (RFQ), specifically updating "REV. 1 TERMS AND CONDITIONS - CLAUSES AND PROVISIONS."
People
Points of Contact
Keasha ColvinPRIMARY
Kristy BarnetteSECONDARY