USNS LUCY STONE (T-AO 209) FY27 Post Shakedown Availability (PSA)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, through MSCHQ NORFOLK, is soliciting proposals for the FY27 Post Shakedown Availability (PSA) for the USNS LUCY STONE (T-AO 209). This is a Firm Fixed Price contract for comprehensive ship repair and dry-docking services. Proposals are due June 12, 2026, at 5:00 PM EST.
Scope of Work
This opportunity involves the Regular Overhaul/Dry-Docking (ROH/DD) of the USNS LUCY STONE (T-AO 209). The scope includes preparing for and accomplishing the ROH/DD, performing scheduled maintenance (Category A Work Instructions), and potentially unscheduled maintenance (Supplemental Work Instructions). Optional Category "B" Work Items cover services such as Physical Security, Continuation of Services, CPP Blade Machining, and Drydocking/Undocking the vessel. Contractors will be required to prepare and submit data as specified in the Contract Data Requirements List (CDRL). An inspection of the USNS LUCY STONE was scheduled for April 22-23, requiring pre-registration.
Contract Details
- Contract Type: Firm Fixed Price.
- Period of Performance: January 18, 2027, to June 3, 2027, for primary CLINs, with an option extending to June 6, 2027.
- Product Service Code: J999 (Non Nuclear Ship Repair (West)).
- Estimated Scale: CLIN 0001AB indicates approximately 21,207 man-hours and $3,388,206.00 in Material/Other Direct Costs.
- Set-Aside: None specified.
Submission & Evaluation
- Proposal Submission Deadline: June 12, 2026, at 5:00 PM EST.
- Requests for Clarification (RFCs) Deadline: May 29, 2026, at 5:00 PM EST.
- Submission Method: Electronically via the Procurement Integrated Enterprise Environment (PIEE).
- Evaluation Basis: Lowest Price Technically Acceptable (LPTA).
- Evaluation Factors: Technical factors (Understanding the Work Instruction Package, Ability to Perform, Management Control, Quality Assurance), Past Performance, and Price. The Government intends to award without discussions but reserves the right to hold them.
- New Clause: FAR Clause 52.222-90, "Addressing DEI Discrimination by Federal Contractors" (Deviation 2026-00038), has been incorporated.
Key Requirements & Attachments
Bidders must sign a Technical Non-Disclosure Agreement (NDA) (Attachment J-14) to access sensitive technical data, with flow-down requirements for subcontractors. Detailed Government Furnished Property (GFP) is outlined in Attachment J-4. Offerors are required to complete and submit a Ship Repair Facility Survey (Attachment J-7) and a Dry Dock Evaluation Form (Attachment J-11) to demonstrate capabilities. Past Performance Data (Attachment J-12) and a Past Performance Questionnaire (Attachment J-13) are critical for evaluation. Bidders must use the provided Interport Differentials (Attachment J-10) for various locations when calculating their total price, as these will be added for evaluation purposes. Pricing breakdown templates (J-2, J-3) are provided for detailed cost proposals.