USS SHIP FY27 MID-TERM AVAILABILITY

SOL #: N6817126RN006Pre-Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP FLC SIGONELLA NAPLES OFFICE
FPO, AE, 09622-0050, United States

Place of Performance

N/A, AX1

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (East) Ship Repair (Including Overhauls And Conversions) Performed On Non Nuclear Propelled And Nonpropelled Ships East Of The 108th Meridian (J998)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 30, 2026
2
Response Deadline
May 8, 2026, 11:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, specifically NAVSUP FLC SIGONELLA NAPLES OFFICE, has issued a Presolicitation Notice for the FY2027 Mid-Term Availability (MTA) repairs of the USS MOUNT WHITNEY (LCC-20). This notice is for market research and informational purposes, indicating an intent to issue a Request for Proposals (RFP) for comprehensive maintenance services. Interested parties must submit a Notice of Interest by June 12, 2026.

Scope of Work

The MTA encompasses extensive alterations, repairs, and critical maintenance across various systems and areas of the vessel. This includes:

  • General Services and Requirements
  • Hull and Structural preservation and repair
  • Propulsion Machinery and Auxiliary Machinery overhauls
  • Electrical, Communication and Navigation system maintenance
  • Habitability Outfitting and Furnishings
  • Sponsor Related work
  • Heat, Ventilation and Air Conditioning (HVAC) systems
  • Propeller Clean and Polish / Hull Inspection All repair works must be performed at a pier-side facility. A detailed Work Item Index Report provides specific tasks and inspections, aiding bidders in understanding the full scope and required technical disciplines.

Contract & Timeline

  • Opportunity Type: Presolicitation
  • Period of Performance: January 12, 2027, through March 13, 2027.
  • Location Restriction: The contractor's facility must be located in the Mediterranean basin or the European Atlantic Ocean coastline (including the UK, Ireland, Netherlands, Belgium, France, Spain, and Portugal). The facility must also be in a country with an International Agreement with the U.S. or approved via an exception to policy.
  • RFP Release: Estimated by the end of June/beginning of July 2026, to be posted on SAM.gov (RFP N6817126RN006).
  • Notice of Interest Due: June 12, 2026. Responses should include company details, primary POC, and a one-page capability summary.
  • Published Date: April 30, 2026.

Eligibility / Set-Aside

Not specified in this presolicitation notice.

Additional Notes

An optional, but recommended, Ship Check will be conducted on May 13-14, 2026, in Gaeta, Italy. Companies wishing to attend must submit a request by May 8, 2026, 13:00 CET, with a maximum of four attendees per company. Primary Point of Contact: Anna Guarino (Anna.guarino4.ln@us.navy.mil, 0039815683573).

People

Points of Contact

Files

Files

Download
Download

Versions

Version 1Viewing
Pre-Solicitation
Posted: Apr 30, 2026
USS SHIP FY27 MID-TERM AVAILABILITY | GovScope