Vertical Roll Out Sheet Storage Racks

SOL #: 1333ND26QNB130175Combined Synopsis/Solicitation

Overview

Buyer

Commerce
National Institute Of Standards And Technology
DEPT OF COMMERCE NIST
GAITHERSBURG, MD, 20899, United States

Place of Performance

Gaithersburg, MD

NAICS

Hardware Manufacturing (332510)

PSC

Specialized Shipping And Storage Containers (8145)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 15, 2026
2
Submission Deadline
Apr 21, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Institute of Standards and Technology (NIST), under the Department of Commerce, is soliciting quotations for two vertical roll-out sheet storage racks for its Fabrication Technology Group in Gaithersburg, MD. This requirement includes delivery and installation to improve the efficient and safe storage of sheet metal materials. This is a 100% Small Business Set-Aside opportunity. Quotations are due by April 21, 2026, at 11:00 AM ET.

Scope of Work

NIST requires two (2) vertical roll-out sheet storage racks to store and manage sheet metal materials, particularly those up to 52" x 48". The system must optimize space, ensure ease of access, and be installed by the Contractor. Key requirements include:

  • Quantity: Two (2) roll-out sheet racks.
  • Dimensions: Must accommodate material up to 52" x 48"; drawer dimensions 52" x 48"; overall width (with floor plates) 71"; depth (open) 105"; height 96".
  • Capacity: 5000 pounds Uniformly Distributed Load (UDL) per drawer.
  • Material: Heavy-duty steel construction, engineer load rated.
  • Design: Roll-out drawers for easy access, stable frame to prevent tipping.
  • Installation: To be completed no later than 60 days after receipt of order, including uncrating, rigging, set-up, hook-up, demonstration, and trash removal.
  • New Equipment: Only new, unused equipment will be considered.
  • Documentation: Original manufacturer's packaging, documentation, and a schematic drawing are required.
  • Place of Performance: NIST, Gaithersburg, MD, Building 304.

Contract & Timeline

  • Contract Type: Firm-fixed-price quotation (Combined Synopsis/Solicitation).
  • Period of Performance/Lead Time: 14 weeks after receipt of order for delivery. Installation within 60 days of order.
  • Questions Due: April 16, 2026, 11:00 AM ET.
  • Quotations Due: April 21, 2026, 11:00 AM ET.
  • Quotation Validity: Quotations must remain valid for 90 days from the due date.
  • Payment: 100% after installation and acceptance by the Technical Point of Contact (TPOC), successful testing, demonstration, and receipt of a proper invoice (Net 30-day terms).
  • Warranty: Minimum of 1 year after receipt of equipment.

Evaluation & Eligibility

  • Set-Aside: This is a 100% Small Business Set-Aside.
  • NAICS Code: 332510 – Hardware Manufacturing, with a size standard of 750 employees.
  • Evaluation Criteria: Award will be made to the lowest-priced, technically acceptable offeror. Technical capability must meet or exceed minimum requirements, with supporting evidence provided.
  • Submission: Quotations must be submitted electronically via email to robert.singman@nist.gov.
  • SAM Registration: Offerors must be "active" registrants in the U.S. System for Award Management (SAM) at the time of solicitation close.
  • Government Rights: The Government reserves the right to award without discussions.

Additional Notes

Offerors must submit quotations in two volumes: Technical Quotation and Price Quotation. Specific instructions regarding the Buy American Act and other FAR clauses are included.

People

Points of Contact

Robert SingmanPRIMARY

Files

Files

Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
Vertical Roll Out Sheet Storage Racks | GovScope