W912DY26RA032
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The US Army Corps of Engineers Engineering and Support Center, Huntsville, on behalf of the Veteran's Administration, is soliciting proposals for Pre-demolition Environmental Surveys at the Veteran's Medical Center facility in Palo Alto, California. This opportunity is a Women-Owned Small Business (WOSB) Program Set-Aside. The primary objective is to conduct comprehensive environmental sampling and analysis for Building 54. Proposals are due by February 18, 2026.
Scope of Work
This contract requires the performance of pre-demolition surveys, including environmental sampling of Building 54. The contractor will determine the presence of Asbestos-Containing Materials (ACM) and Ozone-Depleting Refrigerants (ORM), and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP), and PCBs-in-paint. All sampling must adhere to Federal, State, and local regulations. Laboratory testing and analysis are to be completed within 35 workdays of site sampling. A Pre-Demolition Assessment Report, detailing environmental contamination and removal methods, is required within 15 workdays of receiving sample results. The scope includes accessing all reasonable areas of the facility exterior, roof, basement, and crawl spaces.
Contract & Timeline
- Type: Solicitation
- Set-Aside: Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
- Product Service Code: F999 (Other Environmental Services, Studies, And Analytical Support)
- Proposal Due: February 18, 2026, 3:00 PM ET
- Published: February 17, 2026
Additional Notes
Refer to the Performance Work Statement (PWS) and all attached documents for complete requirements and specifics. Any areas inaccessible during the survey must be noted in the report, including size and previous use. Contact Benjamin Hoell for inquiries.