W912P626BA003 Chesterton Interceptor Rehab
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, W072 ENDIST CHICAGO, has issued a Solicitation for the Chesterton Interceptor Rehabilitation project in Chesterton, Porter County, Indiana. This opportunity seeks to extend the life of a 48-inch RCP sewer interceptor through segmented slip lining. Proposals are due March 4, 2026.
Scope of Work
The project involves the rehabilitation of approximately 3,300 feet of a 48-inch Reinforced Concrete Pipe (RCP) sewer interceptor along 8th Street, extending to the Wastewater Treatment Plant on League Lane. The primary method will be segmented slip lining, utilizing insertion pits where pipe segments will be lowered and pushed into the existing sewer via a hydraulic press.
Contract & Timeline
- Type: Solicitation
- Product Service Code: Y1NZ (Construction Of Other Utilities)
- Set-Aside: None specified
- Response Due: March 4, 2026, 8:00 PM ET
- Published: January 30, 2026
Evaluation
Evaluation criteria are not detailed in the provided information.
Additional Notes
For further information, contact Adam Haley (Primary) at adam.j.haley@usace.army.mil or 312-846-5494, or Kyle Smith (Secondary) at Kyle.D.Smith@usace.army.mil or (312) 846-5368.