W912P626BA003 Chesterton Interceptor Rehab
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army / US Army Corps of Engineers, Chicago District has issued a Solicitation for the Chesterton Interceptor Rehabilitation project in Chesterton, Porter County, Indiana. This project aims to extend the life of a 48-inch RCP sewer interceptor through segmented slip lining. Proposals are due March 4, 2026.
Scope of Work
The project involves the rehabilitation of approximately 3,300 feet of 48-inch RCP sewer interceptor along 8th Street. The primary method will be segmented slip lining. This process requires the use of insertion pits, where pipe segments will be lowered and pushed into the existing sewer via a hydraulic press. The rehabilitated pipe will span from 8th Street and Morgan Avenue to the Wastewater Treatment Plant on League Lane in Chesterton, Indiana. Details regarding a pre-bid meeting are mentioned as being posted under this update.
Contract & Timeline
- Type: Solicitation
- Product Service Code: Y1NZ (Construction Of Other Utilities)
- Set-Aside: None specified
- Proposal Due: March 4, 2026
- Published: February 9, 2026
Additional Notes
Interested parties should note that details for a pre-bid meeting are referenced in the original description. For questions, contact Kyle Smith at Kyle.D.Smith@usace.army.mil or (312) 846-5368. Several documents related to the PIEE Solicitation Module are also available, which may contain instructions for proposal submission.