WA NP OLYM 115(1), Repair Storm Damage on Mora Road

SOL #: 69056725B000015Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

Forks, WA

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Aug 21, 2025
2
Last Updated
Feb 25, 2026
3
Submission Deadline
Jan 28, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), under the Department of Transportation, has awarded a Firm Fixed-Price contract for WA NP OLYM 115(1), Repair Storm Damage on Mora Road to S.E.A. Construction, LLC. This Total Small Business Set-Aside award, valued at $4,298,421.00, was made on February 9, 2026.

Project Overview

This project, located at Mile Post 1.25 on Mora Road within Olympic National Park, Forks, WA, addresses storm damage, erosion, and aims to improve fish habitat. It is a collaborative effort between FHWA, Olympic National Park, and the Quileute Tribe, designed to ensure long-term access to Rialto Beach and Tribal lands.

Scope of Work

The scope encompasses engineered log jam construction and bank stabilization through the installation of deflector, revetment, and large deflector structures. These structures utilize materials such as placed riprap, log barriers, root wads, and untreated timber piles. The project also includes soil erosion and sediment control, creation of temporary access roads, plantings, and temporary traffic control. All work adheres to the U.S. Department of Transportation's FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects.

Contract Details

  • Contract Type: Firm Fixed-Price
  • Award Value: $4,298,421.00 (for Base Schedule A)
  • Period of Performance: Completion is expected by October 29, 2026, with a Notice to Proceed anticipated by March 2, 2026. In-water work is subject to restrictions, permitted only between July 15 and February 15.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Location: Mora Road, Mile Post 1.25, Olympic National Park, Forks, WA, adjacent to Quileute Tribe Reservation lands.

Award Information

The contract was awarded to S.E.A. Construction, LLC on February 9, 2026. The solicitation, designated as a Total Small Business Set-Aside, attracted four bids. S.E.A. Construction, LLC's bid of $4,298,421.00 was the lowest, falling below the Engineer's Estimate of $4,769,028.00.

Key Amendments & Clarifications

During the solicitation process, several amendments were issued. Amendment A003 extended the bid opening date to February 6, 2026. Amendment A004 revised project location details, updated Davis-Bacon wage schedules, and modified Tribal Employment Rights Ordinance (TERO) requirements, notably deleting Indian Preference Section 107A. Clarifications also addressed the availability of the Storm Water Pollution Prevention Plan (SWPPP) and guidance for accessing vendor lists.

Contact

For general inquiries, the primary contact is Contracts G. Office at wfl.contracts@dot.gov or 360-619-7520.

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
View
Download
Download

Versions

Version 17
Award Notice
Posted: Feb 25, 2026
View
Version 16
Solicitation
Posted: Feb 9, 2026
View
Version 15
Solicitation
Posted: Feb 6, 2026
View
Version 14
Solicitation
Posted: Feb 5, 2026
View
Version 13
Solicitation
Posted: Feb 2, 2026
View
Version 12
Solicitation
Posted: Feb 2, 2026
View
Version 11
Solicitation
Posted: Jan 28, 2026
View
Version 10
Solicitation
Posted: Jan 27, 2026
View
Version 9
Solicitation
Posted: Jan 27, 2026
View
Version 8
Solicitation
Posted: Jan 21, 2026
View
Version 7
Solicitation
Posted: Jan 16, 2026
View
Version 6Viewing
Solicitation
Posted: Jan 7, 2026
Version 5
Solicitation
Posted: Jan 6, 2026
View
Version 4
Solicitation
Posted: Dec 31, 2025
View
Version 3
Solicitation
Posted: Dec 18, 2025
View
Version 2
Solicitation
Posted: Dec 15, 2025
View
Version 1
Pre-Solicitation
Posted: Aug 21, 2025
View