WA NP OLYM 115(1) , Repair Storm Damage on Mora Road
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Highway Administration (FHWA), under the Department of Transportation, has awarded a Firm Fixed-Price contract for WA NP OLYM 115(1), Repair Storm Damage on Mora Road to S.E.A. Construction, LLC. This Total Small Business Set-Aside award, valued at $4,298,421.00, was made on February 9, 2026.
Project Overview
This project, located at Mile Post 1.25 on Mora Road within Olympic National Park, Forks, WA, addresses storm damage, erosion, and aims to improve fish habitat. It is a collaborative effort between FHWA, Olympic National Park, and the Quileute Tribe, designed to ensure long-term access to Rialto Beach and Tribal lands.
Scope of Work
The scope encompasses engineered log jam construction and bank stabilization through the installation of deflector, revetment, and large deflector structures. These structures utilize materials such as placed riprap, log barriers, root wads, and untreated timber piles. The project also includes soil erosion and sediment control, creation of temporary access roads, plantings, and temporary traffic control. All work adheres to the U.S. Department of Transportation's FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects.
Contract Details
- Contract Type: Firm Fixed-Price
- Award Value: $4,298,421.00 (for Base Schedule A)
- Period of Performance: Completion is expected by October 29, 2026, with a Notice to Proceed anticipated by March 2, 2026. In-water work is subject to restrictions, permitted only between July 15 and February 15.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Location: Mora Road, Mile Post 1.25, Olympic National Park, Forks, WA, adjacent to Quileute Tribe Reservation lands.
Award Information
The contract was awarded to S.E.A. Construction, LLC on February 9, 2026. The solicitation, designated as a Total Small Business Set-Aside, attracted four bids. S.E.A. Construction, LLC's bid of $4,298,421.00 was the lowest, falling below the Engineer's Estimate of $4,769,028.00.
Key Amendments & Clarifications
During the solicitation process, several amendments were issued. Amendment A003 extended the bid opening date to February 6, 2026. Amendment A004 revised project location details, updated Davis-Bacon wage schedules, and modified Tribal Employment Rights Ordinance (TERO) requirements, notably deleting Indian Preference Section 107A. Clarifications also addressed the availability of the Storm Water Pollution Prevention Plan (SWPPP) and guidance for accessing vendor lists.
Contact
For general inquiries, the primary contact is Contracts G. Office at wfl.contracts@dot.gov or 360-619-7520.