Waste removal from Sauvage Bayou

SOL #: 12639526Q0091Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Animal And Plant Health Inspection Service
MRPBS MINNEAPOLIS MN
MINNEAPOLIS, MN, 55401, United States

Place of Performance

New Orleans, LA

NAICS

Site Preparation Contractors (238910)

PSC

Construction Of Unimproved Real Property (Land) (Y1PC)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 13, 2026
2
Last Updated
May 20, 2026
3
Submission Deadline
May 22, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of Agriculture (USDA), specifically the Animal and Plant Health Inspection Service (APHIS), is seeking proposals for Waste Removal and Remediation Services at the Bayou Sauvage Urban National Wildlife Refuge in New Orleans, LA. This Total Small Business Set-Aside opportunity requires the removal and deep burial of APHIS-regulated waste and commingled materials. Quotes are due by May 22, 2026, at noon CT.

Scope of Work

The project involves the removal and remediation of waste found in Bayou Sauvage to prevent the entry and spread of potential invasive APHIS-regulated plant pests and pathogens. Key tasks include:

  • Securing a lease for private property serving as the entry point to the dump site (APHIS currently holds a temporary lease).
  • Site preparation and mobilization, including securing permits and submittal of plans (safety, QC, stormwater, pollution control).
  • Earthwork and hydrological controls, such as swamp mat placement, coffer dam construction, waste sorting, excavation, dewatering, and soil management.
  • Deep burial of APHIS-regulated waste at a designated landfill.
  • Site restoration, including wetland seeding and removal of temporary controls.
  • Work must commence within 10 calendar days after Notice to Proceed (NTP) and be completed within 60 days after NTP.

Contract & Timeline

  • Contract Type: Combined Synopsis/Solicitation (Request for Quotations - RFQ)
  • Estimated Magnitude: $5M - $10M
  • Period of Performance: 60 days after NTP
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Response Date: May 22, 2026, at noon CT (extended by Amendment 1)
  • Published Date: May 2, 2026

Evaluation & Submission

Quotes will be evaluated based on "highest technically rated with a fair and reasonable price," with no tradeoffs between price and non-price factors. Evaluation factors include Price, Technical Capability (including Technical Approach), and Past Performance.

  • Submission: Complete quote package must include the RFQ cover page, price schedule, demonstration of relevant experience, and past performance information. Submit to james.g.roloff@usda.gov.
  • Mandatory Site Visit: A mandatory site visit was scheduled for April 30, 2026, at 2 p.m. CT. Attendance was required for quote consideration. A list of attendees is available.
  • Questions Due: May 8, 2026, at noon CT.

Key Attachments

  • Price Schedule: Outlines specific tasks and phases for pricing.
  • Technical Specifications: Details technical requirements, scope of work, and conditions for the project.
  • Aerial Photo of Site: Provides visual information on estimated waste removal areas, types (regulated/unregulated), volumes, and proposed cofferdam location.
  • Federal Construction Wage Rates: Specifies prevailing wage rates for Orleans Parish, LA, for labor cost estimation.
  • Site Visit Attendees: List of companies and individuals who attended the mandatory site visit.

Contact Information

For inquiries, contact Jim Roloff at james.g.roloff@usda.gov or 612-590-7603.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: May 20, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: May 13, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 2, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 13, 2026
View