Water Tower Inspections and Repair

SOL #: FA441726R0008Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4417 1 SOCONS
HURLBURT FIELD, FL, 32544-5810, United States

Place of Performance

Hurlburt Field, FL

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Maintenance Of Water Supply Facilities (Z1NE)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 23, 2026
2
Last Updated
Apr 24, 2026
3
Submission Deadline
May 7, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, 1 SOCONS, is soliciting proposals for Water Tower Inspections and Repair Services at Hurlburt Field, FL. This acquisition is for a Fixed-Price Indefinite-Delivery Indefinite-Quantity (IDIQ) contract to ensure the operational integrity of four water towers. This is a Women-Owned Small Business set-aside. Proposals are due May 7, 2026.

Scope of Work

The contract requires comprehensive services including inspection, cleaning, painting, and repair of four specific water towers (Tower #2, #5, #7, and #808) at Hurlburt Field, FL. Services will be provided on an "as-needed" basis via task orders. Key activities include interior cleaning and inspection every five years, and annual exterior checks. Deliverables include written reports with findings, recommendations, photographs, and estimated repair costs.

Contract & Timeline

  • Type: Fixed-Price Indefinite-Delivery Indefinite-Quantity (IDIQ)
  • Duration: Five (5) years
  • Value: Guaranteed minimum of $4,000.00; maximum not to exceed $2,000,000.00
  • Set-Aside: Women-Owned Small Business
  • Product/Service Code: Z1NE - Maintenance Of Water Supply Facilities
  • Questions Due: April 13, 2026, at 1:00 PM CDT
  • Proposals Due: May 7, 2026, at 2:00 PM CDT
  • Published: April 7, 2026

Performance Requirements

Work must comply with American Water Works Association (AWWA) Standards D100 and D102, and Florida Department of Environmental Protection (DEP) 62-555.350. Inspections must be conducted by a licensed professional engineer. Minimizing water tower downtime is imperative.

Special Instructions

Contractor personnel and vehicles require compliance with Hurlburt Field base entry and security regulations; requests for base access for proposal delivery must be emailed NLT 72 hours prior to the proposal due date. All work must adhere to applicable safety (OSHA, Air Force standards) and environmental protection regulations. Coordination for service interruptions must be made with 1SOCES Inspector or Contracting Officer.

Contact Information

For inquiries, contact Abigail Turek at abigail.turek@us.af.mil or 850-884-1433.

People

Points of Contact

Files

Files

View
View
View
View
Download

Versions

Version 3
Combined Synopsis/Solicitation
Posted: Apr 24, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 7, 2026
Version 1
Sources Sought
Posted: Jan 23, 2026
View
Water Tower Inspections and Repair | GovScope