Water Well Drilling Project at California Hotel
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Embassy in Bujumbura, Burundi is issuing a Presolicitation Notice for a Water Well Drilling Project at the Embassy residence, California Hotel. This project aims to establish a fully functioning water well, including pump installation and connection to a bulk water supply fill station, to serve Embassy residential areas. The formal solicitation will be released on SAM.gov. Quotations are due by March 13, 2026.
Scope of Work
The contractor will be responsible for all supervision, labor, management, facilities, supplies, equipment, materials, and services required for drilling a new water well. This includes purchasing and installing the well pump and connecting the well to a bulk water supply fill station located at Embassy 02 Compound outside the perimeter wall. The objective is to supply water to Embassy residential areas via a water distribution truck that can easily connect to the filling station.
Contract & Timeline
- Type: Presolicitation Notice for a future Firm Fixed-Price contract.
- Set-Aside: None specified (N/A).
- Response Due: March 13, 2026, 9:00 am Local Time.
- Published: January 20, 2026 (Presolicitation Notice posted January 28, 2026).
- Place of Performance: U.S. Embassy Burundi, 50 Avenue des Etats - Unis, Kigobe Sud - Ntahangwa, Bujumbura, Burundi.
Submission & Evaluation
All responsible sources are invited to submit a quotation. The Government may award the contract based on the initial offer without discussion. Electronic responses are permitted, with a maximum of 30MB per email (multiple emails allowed for larger submissions). Contractors must be registered in the SAM Database prior to submitting an offer.
Additional Notes
A pre-quotation conference will be held, with details to be provided in the forthcoming solicitation.