Weeks Brook Bridge Railing Repair, Franklin Falls Dam, Sanbornton, NH

SOL #: W912WJ26QA100Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2SD ENDIST NEW ENGLAND
CONCORD, MA, 01742-2751, United States

Place of Performance

Place of performance not available

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 1, 2026
2
Last Updated
Jun 2, 2026
3
Submission Deadline
Jun 8, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, New England District (USACE), is soliciting proposals for the Weeks Brook Bridge Railing Repair project at Franklin Falls Dam, Sanbornton, NH. This Total Small Business Set-Aside opportunity involves the removal of existing bridge railing and posts, and the installation of a new railing system. The estimated magnitude of construction is between $25,000 and $100,000. Proposals are due by June 8, 2026.

Scope of Work

The work primarily consists of:

  • Complete removal of the existing bridge railing and posts at Weeks Brook Bridge.
  • Installation of a new railing system, anchored to the superstructure, detailed in contract drawings.
  • New railing posts and guardrails must conform to New Hampshire Department of Transportation (NHDOT) standard details and specifications.
  • Connections to the existing bridge superstructure must follow project-specific designs.
  • Installation of new bridge hazard markers and weight limit signs.
  • Compliance with U.S. Army Corps of Engineers (USACE) Safety and Occupational Health Requirements (EM 385-1-1) and all applicable OSHA, Federal, State, and local safety requirements.
  • Specific material standards apply, including galvanization for steel components (AASHTO M232, M111) and pressure-treated lumber for deck edges.

Contract Details

  • Contract Type: Firm Fixed Price.
  • Estimated Value: Between $25,000 and $100,000.
  • Period of Performance: 150 days from the Notice to Proceed.
  • Work Hours: Monday through Friday, 7:00 AM to 3:30 PM.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 237310 (Highway, Street, and Bridge Construction) with a $45 Million size standard.
  • Bonds: Payment and Performance Bonds are required for contracts $35,000 or above; a Bid Guarantee is not required.

Submission & Evaluation

  • Proposal Due Date: June 8, 2026, at 5:00 PM Eastern Time.
  • Submission Method: Quotes must be submitted via email to the Contract Specialist, Jennifer M. Samela.
  • Evaluation Criteria: Technical factors, price, and past performance.
  • Required Forms: Bidders must complete and submit a "Solicitation Survey" with their quote. This survey requires detailed company information, business type, years of experience (prime, sub, federal), personnel details, certifications/licenses (e.g., First Aid/CPR, Fall Protection, Rope Access, Crane Operator, SSHO), and three past performance references from the last three years, similar in size and complexity. Submissions including certifications or course information will be rated higher.

Important Notes

  • SAM.gov Registration: All vendors must have an active registration in SAM.gov at the time of submission to be considered. Non-compliant vendors will be rejected.
  • Site Visit: A site visit was previously scheduled for May 26, 2026. The latest amendment indicates "NONE" for the attendee list, suggesting it has concluded or is no longer open for new attendees.
  • Railing Measurement Clarification: The approximate linear feet of railing is 17' 10" per side of the bridge, but contractors are responsible for verifying measurements.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: Jun 2, 2026
Version 3
Solicitation
Posted: May 26, 2026
View
Version 2
Solicitation
Posted: May 19, 2026
View
Version 1
Pre-Solicitation
Posted: May 1, 2026
View
Weeks Brook Bridge Railing Repair, Franklin Falls Dam, Sanbornton, NH | GovScope