West Shore Lake Pontchartrain WSLP 114

SOL #: W912P825B0024Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W07V ENDIST NEW ORLEANS
NEW ORLEANS, LA, 70118-3651, United States

Place of Performance

LA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 27, 2025
2
Last Updated
Jan 20, 2026
3
Submission Deadline
May 20, 2025, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Amendment 0003: Bid opening on 20 May 2025 at 10:00 a.m. CST has been temporarily postponed and a new bid opening date w ill be established in a forthcoming amendment. Please see amendment 0003 in the attachments.

Amendment 0002: Please see amendment 0002 in the attachments. 

Amendment 0001: Please see amendment 0001 in the attachments. 

Edit: This notice is edited to add WSLP_114_Signed Submittal Drawings-4 of 4

The U.S. Army Corps of Engineers - New Orleans District is issuing a Solicitation for Reserve Relief & I-55 Pump Stations and Drainage Structures, WSLP-114. 

This requirement is unrestricted under invitation for bid W912P825B0024. 

It is being procured as a firm fixed price under FAR part 14, Sealed Bidding. The designated NAICS code is 237990. 


The work consists of clearing and grubbing; pump station and associated construction, drainage structure construction, floodwall
construction (including braced floodwall and floodwall construction adjacent to and underneath an elevated highway); stop log construction, wingwall construction, placement of steel sheet piling, H-piling, pipe piles, precast/prestressed concrete piles, geotextile, geogrid, grouted riprap; installation of metal ladders, stairs, cat walk, and railings; installation of vertical wick drains and horizontal strip drains; stone and bedding construction; slide gates and hoist; precast concrete bridge, steel vehicular swing type flood gate, navigation gate and draw bridge; excavation and embankment placement; miscellaneous metal work, painting, turf establishment; chain link fencing, surfacing, structural excavation and backfill; electrical work; pluming; installation cybersecurity for control systems; construction of temporary retaining structures and dewatering, and other related incidental work.


The Rough Order of Magnitude of construction is betw een $250M - $500M. Questions are due NLT 26 March 2025 @ 2:00 PM CST.

People

Points of Contact

Michelle DalmadoSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 19
Solicitation
Posted: Jan 20, 2026
View
Version 18
Solicitation
Posted: Jan 6, 2026
View
Version 17
Solicitation
Posted: Dec 17, 2025
View
Version 16
Solicitation
Posted: Oct 22, 2025
View
Version 15
Solicitation
Posted: Aug 13, 2025
View
Version 14
Solicitation
Posted: Jul 15, 2025
View
Version 13
Solicitation
Posted: Jul 3, 2025
View
Version 12
Solicitation
Posted: Jun 25, 2025
View
Version 11
Solicitation
Posted: Jun 5, 2025
View
Version 10
Solicitation
Posted: Jun 5, 2025
View
Version 9
Solicitation
Posted: May 20, 2025
View
Version 8Viewing
Solicitation
Posted: May 14, 2025
Version 7
Solicitation
Posted: May 14, 2025
View
Version 6
Solicitation
Posted: May 8, 2025
View
Version 5
Solicitation
Posted: Apr 24, 2025
View
Version 4
Solicitation
Posted: Apr 21, 2025
View
Version 3
Solicitation
Posted: Apr 21, 2025
View
Version 2
Solicitation
Posted: Feb 28, 2025
View
Version 1
Solicitation
Posted: Feb 27, 2025
View
West Shore Lake Pontchartrain WSLP 114 | GovScope