West Shore Lake Pontchartrain WSLP 114

SOL #: W912P825B0024Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W07V ENDIST NEW ORLEANS
NEW ORLEANS, LA, 70118-3651, United States

Place of Performance

La Place, LA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 27, 2025
2
Last Updated
Jan 20, 2026
3
Submission Deadline
Aug 15, 2025, 2:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Edit: This solicitation is postponed until further notice. 

Amendment 0007: Please see amendment 0007 in the attachments

Amendment 0006: Please see amendment 0006 in the attachments.

Amendment 0005: Please see amendment 0005 in the attachments. Bid opening date has been re-established. 

Amendment 0004: Please see amendment 0004 in the amendment. Please note the bid opening date will be re-established in a future modification. 

Amendment 0003: Bid opening on 20 May 2025 at 10:00 a.m. CST has been temporarily postponed and a new bid opening date w ill be established in a forthcoming amendment. Please see amendment 0003 in the attachments.

Amendment 0002: Please see amendment 0002 in the attachments. 

Amendment 0001: Please see amendment 0001 in the attachments. 

Edit: This notice is edited to add WSLP_114_Signed Submittal Drawings-4 of 4

The U.S. Army Corps of Engineers - New Orleans District is issuing a Solicitation for Reserve Relief & I-55 Pump Stations and Drainage Structures, WSLP-114. 

This requirement is unrestricted under invitation for bid W912P825B0024. 

It is being procured as a firm fixed price under FAR part 14, Sealed Bidding. The designated NAICS code is 237990. 


The work consists of clearing and grubbing; pump station and associated construction, drainage structure construction, floodwall
construction (including braced floodwall and floodwall construction adjacent to and underneath an elevated highway); stop log construction, wingwall construction, placement of steel sheet piling, H-piling, pipe piles, precast/prestressed concrete piles, geotextile, geogrid, grouted riprap; installation of metal ladders, stairs, cat walk, and railings; installation of vertical wick drains and horizontal strip drains; stone and bedding construction; slide gates and hoist; precast concrete bridge, steel vehicular swing type flood gate, navigation gate and draw bridge; excavation and embankment placement; miscellaneous metal work, painting, turf establishment; chain link fencing, surfacing, structural excavation and backfill; electrical work; pluming; installation cybersecurity for control systems; construction of temporary retaining structures and dewatering, and other related incidental work.


The Rough Order of Magnitude of construction is betw een $250M - $500M. Questions are due NLT 26 March 2025 @ 2:00 PM CST.

People

Points of Contact

Michelle DalmadoSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 19
Solicitation
Posted: Jan 20, 2026
View
Version 18
Solicitation
Posted: Jan 6, 2026
View
Version 17
Solicitation
Posted: Dec 17, 2025
View
Version 16
Solicitation
Posted: Oct 22, 2025
View
Version 15
Solicitation
Posted: Aug 13, 2025
View
Version 14Viewing
Solicitation
Posted: Jul 15, 2025
Version 13
Solicitation
Posted: Jul 3, 2025
View
Version 12
Solicitation
Posted: Jun 25, 2025
View
Version 11
Solicitation
Posted: Jun 5, 2025
View
Version 10
Solicitation
Posted: Jun 5, 2025
View
Version 9
Solicitation
Posted: May 20, 2025
View
Version 8
Solicitation
Posted: May 14, 2025
View
Version 7
Solicitation
Posted: May 14, 2025
View
Version 6
Solicitation
Posted: May 8, 2025
View
Version 5
Solicitation
Posted: Apr 24, 2025
View
Version 4
Solicitation
Posted: Apr 21, 2025
View
Version 3
Solicitation
Posted: Apr 21, 2025
View
Version 2
Solicitation
Posted: Feb 28, 2025
View
Version 1
Solicitation
Posted: Feb 27, 2025
View