P--WICR Demolition and Removal of Excess Building Etc

SOL #: 140P6026Q0008Combined Synopsis/Solicitation

Overview

Buyer

Interior
National Park Service
MWR MIDWEST REGION(60000)
OMAHA, NE, 68102, United States

Place of Performance

Republic, MO

NAICS

Site Preparation Contractors (238910)

PSC

Demolition Of Buildings (P400)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 12, 2026
2
Last Updated
Feb 23, 2026
3
Submission Deadline
Mar 4, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The NATIONAL PARK SERVICE (NPS), specifically the MWR MIDWEST REGION, is seeking quotations for the Demolition and Removal of an Excess Building at Wilson's Creek National Battlefield (WICR) in Republic, MO. This is a Request for Quotation (RFQ) for a firm-fixed-price commercial contract. The opportunity is a Total Small Business Set-Aside. Quotations are due by March 4, 2026, at 1:00 PM CST.

Scope of Work

The project involves the demolition and removal of an approximately 4000 sqft house (built 1979), a concrete pad, PVC rail fence, two utility poles, and the permanent abandonment and capping of a well, along with the removal of an associated septic tank and lateral lines. Site restoration includes the removal of all debris, filling of holes, leveling, grading, and reseeding with a one-year warranty against settling. The contractor is responsible for providing approved fill soil. The period of performance is 180 calendar days from the Notice of Award.

Key Clarifications & Requirements

An amendment has provided answers to offeror questions:

  • Asbestos/HAZMAT: No current asbestos survey exists, and the government is confident there is no asbestos based on the building's age; a survey is not required. No known HAZMATs have been identified.
  • Utilities: Ozark Electric will disconnect power and pull poles at no cost to the contractor. The house is all electric with no gas. Water and septic are in the Scope of Work, but there is no water available on site for contractor use. Two barns will retain power from a separate source.
  • Permits: Aside from a Well Plug Permit, no additional state or local demolition permits are required.
  • Archeologist: A Paraprofessional Archeologist will be available from the park.
  • Recyclable Waste: The government will accept estimates of tonnage for recyclable waste hauled off-site for use as clean fill.
  • Site Access: Limited to the demolition area (20 ft perimeter), with driveways and entrances kept clear.
  • Safety: Contractors must implement an effective accident prevention program and comply with federal and state environmental regulations.

Contract & Timeline

  • Contract Type: Firm Fixed Price Commercial Contract/Award (RFQ)
  • Set-Aside: Total Small Business
  • Response Due: March 4, 2026, 1:00 PM CST
  • Published Date: February 19, 2026
  • Site Visit: A mandatory site visit was held on February 20, 2026, at 1:00 PM CST.

Submission & Evaluation

Quotes will be evaluated based on Technical capability, Past Performance, and Price. Offerors must submit a Technical Questionnaire detailing their project plan, safety plan, and similar past projects. Quotes must be submitted via email to james_bissaillon@nps.gov. Offerors must have an active SAM registration and agree to hold prices for 60 calendar days. Wage Determination (DOL 2015-5087 Rev 28) applies, outlining specific wage rates and fringe benefits for Missouri counties.

People

Points of Contact

Bissaillon, JamesPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 3
Combined Synopsis/Solicitation
Posted: Feb 23, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Feb 19, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Feb 12, 2026
View