P--WICR Demolition and Removal of Excess Building Etc

SOL #: 140P6026Q0008Combined Synopsis/Solicitation

Overview

Buyer

Interior
National Park Service
MWR MIDWEST REGION(60000)
OMAHA, NE, 68102, United States

Place of Performance

Republic, MO

NAICS

Site Preparation Contractors (238910)

PSC

Demolition Of Buildings (P400)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 12, 2026
2
Last Updated
Feb 23, 2026
3
Submission Deadline
Mar 4, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, National Park Service (NPS), MWR Midwest Region, is soliciting quotations for the Demolition and Removal of an Excess Building at Wilson's Creek National Battlefield (WICR) in Republic, Missouri. This is a Total Small Business Set-Aside opportunity for a firm-fixed-price commercial contract. Quotations are due by March 4, 2026, at 1:00 PM CST.

Scope of Work

The project involves the comprehensive demolition and removal of a 4000 sqft house, its concrete pad, approximately 1160 linear feet of PVC rail fence, two utility poles, and associated septic tank and lateral lines. The scope also includes the permanent abandonment and capping of an existing well in accordance with Missouri DNR guidelines. Site restoration is a critical component, requiring the removal of all concrete, fill gravel/rock, metal, and debris, followed by filling holes, leveling, grading, and reseeding with a one-year warranty against noticeable ground settling. The contractor must provide all fill soil, which requires COR approval and must be free of contaminants and large rocks.

Contract & Timeline

  • Contract Type: Firm Fixed Price Commercial Contract
  • Period of Performance: A strict 180 calendar days from the Notice of Award.
  • Response Due: March 4, 2026, 1:00 PM CST
  • Published: February 23, 2026
  • Place of Performance: Wilson's Creek National Battlefield, 6349 State Highway ZZ, Republic, MO 65738

Key Clarifications & Requirements

  • Bonds: Bid, payment, and performance bonds are not required as this is classified as a service, not construction.
  • Asbestos/HAZMAT: No current asbestos survey exists, and the government is confident there is no asbestos. No known HAZMATs have been identified.
  • Utilities: Ozark Electric will disconnect power and pull poles at no cost to the contractor; the contractor is responsible for filling holes and removing wires from the weather head to the house. No gas service. No on-site water is available.
  • Permits: Only a Well Plug Permit is required; no additional state or local demolition permits are necessary.
  • Well Depth: The depth of the existing well is unknown.
  • Wage Determination: The U.S. Department of Labor's wage determination for Missouri (Christian, Dallas, Greene, Polk, Webster counties) applies, covering occupational wage rates, fringe benefits, paid sick leave (EO 13706), and minimum wage (EO 13658).

Submission & Evaluation

Quotations will be evaluated based on Technical capability, Past Performance, and Price. Offerors must submit responses to a Technical Questionnaire detailing their project plan, safety plan, and two to three similar past projects. Submissions must be sent via email to james_bissaillon@nps.gov. A mandatory site visit was held on February 20, 2026.

Contact Information

For questions, contact James Bissaillon, Contract Specialist, at james_bissaillon@nps.gov or 402-800-8292.

People

Points of Contact

Bissaillon, JamesPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Combined Synopsis/Solicitation
Posted: Feb 23, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Feb 19, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 12, 2026
View
P--WICR Demolition and Removal of Excess Building Etc | GovScope